How to Read a Foundation Plan: Grids, Footing Marks, Elevations and Notes

8 min read · By a practising structural engineer · Updated November 2026

Foundation plan sheet with pad footings and grid lines
Sheet from the example drawing set in the course

To read a foundation plan, start with the grid lines, then find each footing mark (F1, F2, SF1) and look it up in the footing schedule for size, depth and reinforcement. Then check the top-of-footing elevations, any step footings, piers and grade beams, and read the plan notes, which often hold information that is drawn nowhere else.

The foundation plan is usually the first structural sheet an estimator or foreman works from. It is also one of the most compressed: one small square with "F2" next to it can stand for a footing size, a depth, a bottom mat, column dowels and an elevation. This article walks through each item on the sheet and then reads a small invented plan from start to finish.

What a foundation plan shows

A foundation plan is a horizontal view looking down at the foundations, as if the building above had been removed and the soil cut away to the top of the footings. It shows:

  • Where each foundation element is, located by grid lines and dimensions.
  • What each element is, through a mark that points to a schedule or a section.
  • How deep each element sits, through elevations.

What it usually does not show is the full reinforcement. The plan points you to the schedule, sections and typical details for that. If the foundation types themselves are new to you (spread footings, strip footings, mats, piles), read foundation types on drawings first.

Grid lines: the coordinate system

Every structural plan hangs on a grid. Grid lines are long chain lines (dash-dot) ending in circles, called grid bubbles. Common practice is numbers in one direction (1, 2, 3) and letters in the other (A, B, C), though the project decides.

Columns usually sit on grid intersections, so the footing under column B-2 is the footing at grid B and grid 2. Dimensions between grid lines are given in strings along the edges of the sheet. Footing positions are dimensioned from the grid, not from the building edge. A footing that is "off grid" will have its own dimension to the nearest grid line, and a common mistake is to assume it is centred on the grid when the plan says otherwise.

Footing marks and the footing schedule

Each footing on the plan carries a mark: F1, F2, F3 for spread (isolated) footings, often something like SF1 or WF1 for strip or wall footings, and PC1 for pile caps. The exact prefixes vary by office, so check the abbreviations list in the general notes or the structural drawing abbreviations guide.

The mark is a key. The footing schedule turns it into numbers:

Mark Size (L × W) Depth Bottom reinforcement Top reinforcement Remarks
F1 6'-0" × 6'-0" 1'-6" 7 #5 EW none
F2 8'-0" × 8'-0" 2'-0" 9 #6 EW none
F3 10'-0" × 10'-0" 2'-6" 11 #7 EW none see section 3/S-301

"EW" means each way, so 7 #5 EW is 7 bars in one direction and 7 bars in the other: 14 bars in the footing. The schedule normally does not give the count of footings. You count those on the plan yourself.

Some smaller jobs skip the schedule and write the size and bars right on the plan next to the footing. The meaning is the same.

Elevations: top of footing and bottom of footing

The plan tells you how deep things are with elevation marks, often written T/F or TOF (top of footing) and sometimes B/F or BOF (bottom of footing). Elevations can be:

  • Relative, for example T/F = -1'-6" below the finished floor, which is called 0'-0" or 100'-0".
  • Absolute, tied to a survey datum.

The general notes often say "top of footing at -1'-6" unless noted otherwise", and the plan only marks the footings that differ. That "unless noted otherwise" (UNO) is easy to miss and it changes the depth of every unmarked footing.

Why the estimator cares: the elevation decides the length of column dowels and pier bars, the height of foundation walls, and the excavation volume.

Step footings

When the ground slopes, or a basement meets a crawl space, a continuous strip footing changes level. On the plan this is shown as a short line across the footing with a note such as "STEP" and a reference to a typical step detail, plus a new T/F elevation on each side.

The step detail shows the vertical part of the footing and the extra bars that run around the corner of the step. On a takeoff, each step adds bars that do not appear on the plan at all, so count the steps on the plan and price the detail once per step.

Piers, pedestals and grade beams

  • Piers or pedestals sit on top of a footing and carry a column down to it. On the plan they appear as a smaller square or circle inside the footing outline, with their own mark (P1, PED1) and a schedule or section giving size and vertical bars and ties.
  • Drilled piers or caissons are deep foundations shown as circles, with a pier schedule giving diameter, depth and bars.
  • Grade beams are reinforced beams at or near grade that span between footings or pile caps. On the plan they are drawn as two parallel lines (often dashed when below the slab) with a mark like GB1, and a section shows their size and bars. See grade beam reinforcement for how they are detailed.

The plan notes

Read every note on the foundation plan before you count anything. Typical content:

  • The assumed allowable soil bearing pressure and the geotechnical report reference.
  • The default T/F elevation (UNO).
  • The slab-on-grade thickness and reinforcement, which is often given only here.
  • "All footings centred on columns UNO."
  • References to typical details for dowels, steps and footings at the property line.

The notes on the foundation sheet work together with the general notes; see general notes on structural drawings.

Worked example: reading a small foundation plan

This is an invented example, kept small so every step can be checked. A single-storey building has a 3 × 3 grid: lines 1, 2, 3 at 24'-0" spacing and lines A, B, C at 20'-0" spacing. There are nine columns, one at each grid intersection.

123ABCF1F2F3GB1GB1T/F -1'-6" UNO
The example plan: F1 at the four corners, F2 at the four edge columns, F3 at the centre column, and grade beam GB1 along grid A.

The plan and schedule give:

  • Footing schedule as in the table above (F1, F2, F3).
  • F1 at A-1, A-3, C-1, C-3. F2 at A-2, B-1, B-3, C-2. F3 at B-2.
  • Note: "T/F = -1'-6" UNO. Cover to footing reinforcement 3 in." (3 in for concrete cast against earth is typical ACI 318 practice, but the project's notes and governing code always win.)
  • GB1 along grid A between the footings, with its own section.

Step 1: count each mark

F1 = 4, F2 = 4, F3 = 1. Total 9, which matches the 9 grid intersections. Always do this check: if the count of footings does not match the count of columns, you have missed one, or there is a combined footing.

Step 2: bar lengths from the schedule

Straight bars, length = footing size minus 3 in cover at each end:

  • F1: 72 in − 6 in = 66 in = 5.50 ft
  • F2: 96 in − 6 in = 90 in = 7.50 ft
  • F3: 120 in − 6 in = 114 in = 9.50 ft

Step 3: bar counts and weights

Mark Qty Bars per footing Total bars Length (ft) Total ft lb/ft Weight (lb)
F1 4 14 #5 56 5.50 308.0 1.043 321.2
F2 4 18 #6 72 7.50 540.0 1.502 811.1
F3 1 22 #7 22 9.50 209.0 2.044 427.2

Footing bottom mats total 1,559.5 lb. Bar weights are the standard ASTM A615 values; you can check them in the rebar sizes reference.

Step 4: what the plan alone does not give you

The plan sent you to other places for the rest: the column dowels (column schedule or a typical dowel detail), the GB1 bars (its section), and any special footing note (F3 refers to section 3/S-301). The plan is the index; the schedule and details are the content. The full footing takeoff method is in how to estimate rebar for footings.

A reading order that works

  1. Read the general notes and the plan notes.
  2. Find the grid and the overall dimensions.
  3. List every mark on the plan and count each one.
  4. Look up each mark in the schedule.
  5. Check elevations, marking every footing that differs from the default.
  6. Find steps, piers, grade beams and pits.
  7. Follow every section cut and detail reference before you finish.
Symbol on the plan Meaning Where the detail lives
F1, F2 Spread footing mark Footing schedule
SF1, WF1 Strip or wall footing (prefix varies) Schedule or section
P1, PED1 Pier or pedestal Pier schedule or section
GB1 Grade beam Section
T/F -1'-6" Top of footing elevation Plan or notes
Circle with "3 / S-301" Section cut Sheet S-301, section 3

Frequently asked questions

What does F1 mean on a foundation plan?

F1 is a footing mark, usually for footing type 1. It refers to a row in the footing schedule that gives the size, depth and reinforcement. Every footing marked F1 on the plan is built the same way.

What does T/F mean on a structural drawing?

T/F (or TOF) means top of footing. It is an elevation, given either relative to the finished floor or to a survey datum. Many plans give one default T/F in the notes and mark only the footings that differ.

Does the foundation plan show the rebar?

Usually not in full. The plan shows where each footing is and its mark, and the footing schedule, sections and typical details give the bars. Slab-on-grade reinforcement is sometimes written as a note on the foundation plan.

How do I count footings on a foundation plan?

Count each mark separately and check the total against the number of columns on the grid. Combined footings, footings under walls and footings at the edge of the property often break the simple one-column-one-footing pattern, so look for them specifically.

This article explains general practice for learning purposes. On a real project, the drawings, the general notes and the governing code always win.

Keep reading

The whole library

Free download

The Rebar Callout Cheat Sheet

One printable page: the five questions every callout answers, four labels decoded, and the same bar in six notations. Keep it next to the set of plans.

Plus a few short emails on reading structural drawings. Unsubscribe any time. Privacy.