Structural Drawing Abbreviations: 100+ Common Terms Explained

9 min read · By a practising structural engineer · Updated November 2026

Typical details sheet: lap splice, hooks, stirrups and edge beam
Sheet from the example drawing set in the course

Structural drawing abbreviations are short codes for positions, elements and instructions, such as EW (each way), EF (each face), T&B (top and bottom), CLR (clear), O.C. (on center) and TYP (typical). Most sets define their own list on the general notes sheet, and that list always wins. The table below covers the abbreviations you will meet on most US-style structural drawings, with notes on the ones that change a bar count.

Read this alongside how to read structural drawings, which explains where these terms appear in a set.

Why structural drawing abbreviations matter for estimating

Most abbreviations are just shorthand for words. A handful are instructions that multiply quantities. "#5 @ 12 EW" is two layers of bars, not one. "#5 @ 12 EF" in a wall is two curtains of bars, one near each face. "TYP" means the same thing happens everywhere similar, even where it is not drawn again. Misread one of these and the whole takeoff for that element is off by a factor of two.

The second reason is consistency. The same letters can mean different things in different offices. CJ is a construction joint on one set and a control joint on another. T.O.S. is top of slab on a concrete job and top of steel on a steel job. When an abbreviation could mean two things, the project's own legend decides.

The full table of structural abbreviations

The meanings below are the common usage on US structural drawings. Check them against the abbreviation list on your general notes sheet.

Position and direction

Abbreviation Meaning Note
T or TOP Top (bars in the top layer)
B or BOT Bottom (bars in the bottom layer)
T&B Top and bottom Doubles the bar count: the callout applies to each layer
EW Each way Bars in both directions of a slab or footing
EF Each face Bars at both faces of a wall or deep element
IF Inside face
OF Outside face
NF Near face
FF Far face Also used for finished floor; check context
NS Near side
FS Far side
HORIZ Horizontal
VERT Vertical
LONG Longitudinal
TRANS Transverse
ABV Above
BLW Below
BTWN Between
OPP Opposite
CL or ℄ Centerline
CTR Center
CTRD Centered

Levels and elevations

Abbreviation Meaning Note
EL or ELEV Elevation (a height level, or an elevation view) Context tells which
T.O.C. Top of concrete
T.O.F. Top of footing
B.O.F. Bottom of footing Sets the depth of excavation and footing
T.O.S. Top of slab, or top of steel Concrete sets usually mean slab
B.O.S. Bottom of slab, or bottom of steel
T.O.W. Top of wall
FF or FFE Finished floor (elevation)
GR Grade
EOS Edge of slab
WP Work point

Elements

Abbreviation Meaning
FTG Footing
FDN Foundation
GB Grade beam
PC Pile cap
SOG Slab on grade
COL Column
BM Beam
JST Joist
CANT Cantilever
CMU Concrete masonry unit
CIP Cast-in-place (concrete)
PT Post-tensioned
HSS Hollow structural section (steel tube)
OPNG Opening
CJ Construction joint, or control joint (check the legend)
EJ Expansion joint
JT Joint

Reinforcement

Abbreviation Meaning Note
REINF Reinforcing, reinforcement
# Bar size number (#5 = 5/8 in nominal) See rebar sizes
Ø or DIA Diameter Metric sets: Ø16 = 16 mm bar
db Nominal bar diameter Used in lap and hook lengths, such as 48 db
CONT Continuous Run the bars full length, lapping as needed
DWL Dowel Short bar tying one pour to the next
HK Hook
STD HK Standard hook Dimensions follow the governing code
STIRR Stirrup
TIE Tie (column or boundary ties)
ADDL Additional Extra bars on top of the typical mesh
ALT Alternate Every other bar, or alternate the direction
SPA Spaces or spacing 4 SPA @ 12" means four spaces, five bars
O.C. On center Spacing measured center to center of bars
CLR Clear Clear cover or clear distance, measured to the bar surface
EMBED Embedment
LAP Lap splice
WWR Welded wire reinforcement
WWF Welded wire fabric Older term for WWR
AB Anchor bolt
GALV Galvanized
f'c Specified compressive strength of concrete
fy Specified yield strength of reinforcement Grade 60 = 60 ksi

Instructions and references

Abbreviation Meaning Note
TYP Typical Applies at all similar locations, drawn or not
SIM Similar Same idea, but dimensions may differ
UNO Unless noted otherwise
UON Unless otherwise noted Same as UNO
NTS Not to scale
EQ Equal Equal spaces
SYM Symmetrical
MIN Minimum
MAX Maximum
REQD Required
STD Standard
EA Each
W/ With
W/O Without
DET or DTL Detail
SECT Section
SCHED Schedule
DWG Drawing
DIM Dimension
EXIST or (E) Existing
(N) New
VIF Verify in field
NIC Not in contract Do not price it
EOR Engineer of record
ARCH Architectural (drawings)
MECH Mechanical (drawings)
STRUCT Structural

Units and loads

Abbreviation Meaning
PSI Pounds per square inch
KSI Kips per square inch
PSF Pounds per square foot
KSF Kips per square foot
PCF Pounds per cubic foot
K or KIP 1,000 pounds
LF Linear feet
SF Square feet
CY Cubic yards
DL Dead load
LL Live load

That is over 100 structural drawing abbreviations. For a plain-English definition of the concepts behind them, see the site glossary.

3-#6 T 3-#6 B #3 STIRR 2" CLR TYP T&B = both layers
"3-#6 T&B" in a beam schedule means three #6 bars at the top and three at the bottom: six bars in all. CLR is measured from the concrete face to the nearest bar surface, here the stirrup.

Worked example: decoding a beam note

A beam schedule line reads:

B1, 12" x 24", 3-#6 T&B CONT, #3 STIRR @ 10" O.C., 1 1/2" CLR TYP UNO

Decoded piece by piece:

  1. 12" x 24": width 12 in, depth 24 in (300 x 600 mm).
  2. 3-#6 T&B: three #6 (19 mm) bars top and three bottom. Total 6 longitudinal bars.
  3. CONT: the bars run the full length of the beam, lapped where a bar is not long enough.
  4. #3 STIRR @ 10" O.C.: #3 (10 mm) stirrups spaced 10 in center to center.
  5. 1 1/2" CLR TYP UNO: 1.5 in clear cover everywhere, unless a detail says otherwise.

Now the numbers for a beam 24'-0" long between outer faces:

  • Longitudinal bar length: 24'-0" minus 1.5" cover at each end = 24.0 - 0.25 = 23.75 ft. That exceeds a 20 ft stock bar, so either 40 ft stock is cut down or the notes' lap rule applies. Assume 40 ft stock, no lap.
  • Longitudinal total: 6 x 23.75 = 142.5 ft. At 1.502 lb/ft for #6: 142.5 x 1.502 = 214.0 lb.
  • Stirrup count: 23.75 ft = 285 in. 285 / 10 = 28.5, round up to 29 spaces, so 30 stirrups. (Number of bars = spaces + 1.)

The stirrup count comes straight from reading O.C. and SPA correctly. If the note had said "29 SPA @ 10"", you would count 30 stirrups the same way. Run the weights through the rebar weight calculator to check your arithmetic. The callout format itself is covered in depth in how to read rebar callouts.

Abbreviations that trip people up

EW vs EF

EW is about directions, EF is about faces. A footing with "#5 @ 12 EW" has one mat with bars in both directions. A wall with "#5 @ 12 EF" has two curtains. A wall with "#5 @ 12 EW EF" has bars both horizontal and vertical, at both faces: four sets of bars.

TYP and SIM

TYP is a promise that a condition repeats. If a corner detail is marked TYP, it applies to every similar corner in the building, including those that are not cut on any section. SIM says "the same idea, adjust to fit", so check dimensions before you copy a quantity across.

CLR vs O.C.

CLR is measured to the surface of the bar. O.C. is measured between bar centers. Cover rules use clear distance; spacing rules almost always use on center. Our concrete cover guide goes further into cover values.

Metric and UK notation

Outside the US, bar sizes are written in millimetres. On UK and many Commonwealth drawings, H16 means a 16 mm high-yield bar, older drawings use T16 for the same idea, and R10 means a 10 mm plain round bar. Fabric (mesh) is often written with a letter and number such as A393 or B503. See international rebar notation for the full picture.

Frequently asked questions

What does TYP mean on structural drawings?

TYP means typical. The note or detail applies to every similar location in the project, whether or not each location is drawn. Estimators should search the whole set for every place a TYP condition occurs and count it.

What is the difference between EW and EF?

EW (each way) means bars in both horizontal directions of a slab, mat or footing. EF (each face) means bars at both faces of a wall or thick element. EW doubles the directions, EF doubles the layers.

What does UNO mean?

UNO stands for "unless noted otherwise". It sets a default, such as cover or bar spacing, that holds everywhere except where a specific drawing or detail shows something different. UON means the same thing.

What does CONT mean on a rebar callout?

CONT means continuous: the bars run the full length of the element. Where one bar is not long enough, bars are spliced, usually by lapping, following the lap rules in the general notes.

Where can I find the abbreviation list for my project?

It is normally on the first structural sheet, with the general notes and the symbol legend. If an abbreviation on the drawings is not on that list and its meaning affects quantity, ask the engineer of record through an RFI.

This article explains general practice for learning purposes. On a real project, the drawings, the general notes and the governing code always win.

Keep reading

The whole library

Free download

The Rebar Callout Cheat Sheet

One printable page: the five questions every callout answers, four labels decoded, and the same bar in six notations. Keep it next to the set of plans.

Plus a few short emails on reading structural drawings. Unsubscribe any time. Privacy.