Types of Foundations and How Each One Looks on a Foundation Plan

8 min read · By a practising structural engineer · Updated November 2026

3D cut-away of a concrete pile with a grade beam cage over its head and column starter bars
3D illustration: The Bending Moment

The main types of foundations are shallow foundations (isolated spread footings, strip or wall footings, combined footings and mat or raft foundations) and deep foundations (driven piles with pile caps, and drilled piers, also called caissons or drilled shafts), often tied together with grade beams. On a foundation plan each type has its own look: squares under columns, continuous bands under walls, one large slab outline for a mat, and circles grouped under caps for piles. Sizes and reinforcement are usually given in a footing or pile schedule, not on the plan itself.

Shallow vs deep foundations

Every foundation does the same job: it spreads the building's loads into the ground without overstressing the soil or settling too much. Which type the engineer chooses depends mostly on the geotechnical report.

  • Shallow foundations bear on soil near the surface. They are used when the soil close to the surface is strong enough.
  • Deep foundations carry load down to stronger soil or rock, through friction along their sides, end bearing at the tip, or both. They are used when the upper soil is weak, compressible or expansive, or when loads are very large.

On the drawings you will often see both in one building: piles under the tower and spread footings under a lightly loaded canopy, for example.

The types of foundations, one by one

Isolated spread footings

A square or rectangular pad of concrete under a single column. On the plan: a rectangle centered (or offset) on a column, with a tag such as F1, F2. The rectangle is often dashed because the footing is below the slab. The schedule gives size, depth and bottom reinforcement, for example 6'-0" x 6'-0" x 1'-6", 7-#5 E.W. BOT.

Strip footings (wall or continuous footings)

A continuous band of concrete under a bearing wall, or along a row of closely spaced columns. On the plan: two parallel dashed lines following the wall, with a tag like WF1 or CF1 and a section mark. Reinforcement is longitudinal bars along the length, sometimes with transverse bars across the width. They are counted per linear foot, with laps and corner bars.

Combined footings

One footing supporting two or more columns, used when columns are too close together for separate pads, or when a column sits at a property line and a pad cannot extend beyond it. Strap footings are a related case: two pads joined by a stiff beam (the strap) that balances the eccentric load of the edge column. On the plan they look like a long rectangle under two columns, or two pads connected by a beam. These footings often have top reinforcement as well as bottom, because they bend in both directions between columns.

Mat or raft foundations

A single thick slab under the whole building or a large part of it. Used when footings would cover most of the footprint anyway, or to bridge over weaker soil. On the plan: one outline with a thickness tag, often with local thickenings under cores and heavy columns. Reinforcement is a top mat and a bottom mat in both directions, plus additional bars in specific zones, frequently shown on separate top and bottom reinforcement plans.

Driven piles and pile caps

Piles are long elements (precast concrete, steel H-piles, steel pipe or timber) driven into the ground. A group of piles is joined at the top by a pile cap, a thick block of reinforced concrete that transfers the column load to the piles. On the plan: small circles or squares for the piles, grouped inside a cap outline, with cap marks such as PC-4 (a cap on 4 piles). Pile caps have a schedule with dimensions, number of piles and reinforcement.

Drilled piers (caissons, drilled shafts)

A hole is drilled, a reinforcing cage is lowered in, and the hole is filled with concrete. Diameters range from small to very large, and some have a belled (widened) bottom. On the plan: a circle under each column with a tag like P1 or DS-1. The schedule gives diameter, length or tip elevation, and the cage: vertical bars plus ties or a spiral. Often a single large pier sits under each column, so no cap is needed.

Grade beams

Reinforced concrete beams at or near ground level that span between footings, piers or pile caps. They carry walls, tie the foundation elements together, and can resist lateral loads. On the plan: a band between caps or piers, tagged GB1, with a schedule or section showing top bars, bottom bars and stirrups, much like an ordinary beam.

F1WF1PC-4GB1grade beampiles (red)
How three common foundation types are drawn on a plan: an isolated footing F1, a strip footing WF1 under a wall, and a four-pile cap PC-4 tied by a grade beam.

Comparing the types of foundations on drawings

Type Plan symbol Typical tag Where the reinforcement is given Measured as
Isolated spread footing Rectangle under one column F1, F2 Footing schedule Each (count)
Strip / wall footing Continuous band under wall WF1, CF1 Section or schedule Linear ft (m)
Combined / strap footing Long pad under 2+ columns, or pads with strap beam CF, SF Detail or schedule Each
Mat / raft One outline, thickness tags MAT Top and bottom reinforcement plans Area plus local extras
Pile cap Outline with pile circles inside PC-3, PC-4 Pile cap schedule Each
Drilled pier / caisson Circle under column P1, DS-1 Pier schedule Each, with length
Grade beam Band between caps or piers GB1 Beam schedule or section Linear ft (m)

Tag letters vary between offices. The legend or the schedule header tells you what the letters mean on your project.

Reading a footing schedule

Most foundation reinforcement sits in schedules. A typical footing schedule has one row per mark:

Mark Size (L x W x D) Bottom bars Top bars Remarks
F1 6'-0" x 6'-0" x 1'-6" 7-#5 E.W. none
F2 8'-0" x 8'-0" x 2'-0" 9-#6 E.W. none
F3 5'-0" x 10'-0" x 1'-6" 6-#6 L.W., 11-#5 S.W. none Rectangular

E.W. means each way. L.W. and S.W. mean long way and short way. In a rectangular footing, the bars in the short direction are not always evenly spaced; some codes and details concentrate more of them near the column, so read the note under the schedule.

Pile cap and pier schedules follow the same idea but add the number of piles, pile type, capacity, and for piers the cage details. See how to read rebar callouts if the notation is new to you.

Worked example: one spread footing from the schedule

Take footing F1 from the schedule above: 6'-0" x 6'-0" x 1'-6" (1.83 m x 1.83 m x 0.46 m), 7-#5 E.W. BOT. The general notes give 3 in (75 mm) clear cover for concrete cast against earth, a common value; your project's notes govern.

Step 1: bar length. Each bar runs the full width less cover at both ends: 6'-0" - 2 x 3 in = 5'-6" = 5.5 ft. This example has straight bars; if the detail shows hooks, add their length.

Step 2: number of bars. 7 bars each way, so 14 bars in total.

Step 3: total length. 14 x 5.5 = 77 ft.

Step 4: weight. #5 weighs 1.043 lb/ft: 77 x 1.043 = 80.3 lb (about 36.4 kg) per footing.

Step 5: concrete. 6 x 6 x 1.5 = 54 ft³ = 54 / 27 = 2.0 yd³ (about 1.53 m³).

Step 6: multiply by count. If the plan shows 14 footings tagged F1, F1 alone is 14 x 80.3 = 1,124 lb of rebar and 28 yd³ of concrete. Then do the same for F2, F3 and so on, and add the column dowels shown in the column schedule or typical detail, since they are often forgotten. The full method, including dowels and hooks, is in estimating rebar for footings, and the concrete volume estimate article covers the concrete side. The concrete calculator is handy for quick checks.

Common mistakes when reading foundation plans

  • Counting tags but missing duplicates. A schedule mark can appear dozens of times; count every occurrence on the plan, and mark them as you go.
  • Missing the step footings. Where the bottom of footing changes elevation, a step detail adds vertical and horizontal bars.
  • Forgetting dowels. Column and wall dowels are shown in typical details, not in the footing schedule.
  • Treating a pier like a footing. Pier cages have length from the schedule or from top and tip elevations, and they have ties or spirals along their whole length.
  • Ignoring the soil notes. Bearing pressure and the geotechnical report reference in the general notes explain why a foundation type was chosen, and occasionally include instructions that change quantities, such as over-excavation.

For a full walkthrough of a drawing set, see how to read structural drawings. Very tall buildings take these ideas to the extreme; the Burj Khalifa video shows what sits under a supertall tower.

Frequently asked questions

What are the main types of foundations?

Shallow foundations: isolated spread footings, strip footings, combined footings and mat or raft foundations. Deep foundations: driven piles with pile caps and drilled piers or caissons. Grade beams often tie these elements together.

What is the difference between a mat foundation and a footing?

A footing supports one column or one wall. A mat is a single large slab supporting many columns and walls, usually reinforced top and bottom in both directions. Mats are chosen when individual footings would be large enough to almost touch, or to spread load over weak soil.

What is a pile cap?

A pile cap is a thick reinforced concrete block that sits on top of a group of piles and transfers the column load into them. On drawings it appears as an outline with pile symbols inside and a mark like PC-4.

What is a grade beam used for?

A grade beam spans between foundation elements such as pile caps or piers. It carries walls above, ties the foundation together and can help resist lateral loads. It is reinforced like a normal beam, with top bars, bottom bars and stirrups.

Where do I find footing sizes on structural drawings?

In the footing schedule, usually on the foundation plan sheet or on a separate schedule sheet. The plan shows only the tag and location; the schedule gives size, depth and reinforcement for each tag.

This article explains general practice for learning purposes. On a real project, the drawings, the general notes and the governing code always win.

Keep reading

The whole library

Free download

The Rebar Callout Cheat Sheet

One printable page: the five questions every callout answers, four labels decoded, and the same bar in six notations. Keep it next to the set of plans.

Plus a few short emails on reading structural drawings. Unsubscribe any time. Privacy.