Forces Explained · No. 19
Where the Steel Goes
Rebar in a Beam, a Column and a Slab
Before the concrete is poured, a building site looks like a cage of steel. To an engineer, every bar has a job.
One rule explains all of it: the steel goes wherever the concrete is stretched. This video shows the longitudinal bars and the stirrups of a beam, the vertical bars and the ties of a column, and the bottom and top layers of a slab, and why each one is where it is.
The full story
Before the concrete is poured, a building site looks like a cage of steel. Bars in every direction, tied together with wire. To most people it looks like a mess. To an engineer, every bar has a job. In this video we look at three elements: a beam, a column and a slab. And at one simple rule that explains all of them.
The rule is this. Concrete is strong when it is squeezed, and weak when it is stretched. Steel is strong both ways. So the steel goes wherever the concrete is stretched. To place the bars, you only need to know where the tension is.
Start with the beam. A beam bends. In the middle of the span it sags, so the bottom is stretched and the top is squeezed. That is why the main bars lie along the bottom. They are called the longitudinal bars, and they are there because of the bending moment.

But if the beam continues over a column, it bends the other way there. Over the support, the top is stretched. So over every support, the main bars are at the top. Follow the moment diagram, and you know where the bars go: at the bottom in the span, at the top over the supports.
A beam has a second enemy: shear. Near the supports, the load tries to slice the beam, and the concrete cracks along a diagonal line. Long bars along the beam do not cross that crack. So we add stirrups: closed loops of steel that wrap around the main bars. Each stirrup crosses the diagonal crack, and holds the two sides together.

The shear is largest near the supports, and smallest in the middle. So look at any beam before the pour. The stirrups are close together near the columns, and further apart in the middle of the span. The spacing of the stirrups is a picture of the shear force.
Now the column. A column is squeezed along its length, and concrete is good at that. So why does it need steel at all? The vertical bars, the longitudinal bars, share the compression with the concrete. In many columns they are simply the minimum amount that the code requires. In heavily loaded columns, they are calculated to carry a real part of the force.

And a column is never loaded perfectly in the centre. A beam on one side, a small error on the site, the wind, an earthquake: all of these bend the column as well. The vertical bars, placed near the faces, take the tension from that bending.
Around the vertical bars go the ties: closed loops, like the stirrups of a beam. They have three jobs. They carry the shear in the column, the shear that comes from the eccentric loads and from sideways forces. They stop the thin vertical bars from buckling outwards, like a ruler that is pushed from both ends. And they hold the concrete core together, so that it can carry more.

That is why the ties are closest together at the top and at the bottom of each column, next to the beams. Those are the places where an earthquake does its damage.
And the slab. A slab is wide and thin, and its main action is bending. So it works like a very wide beam. In the span, the bottom is stretched, and the main bars are in a bottom layer. Over the beams and the walls, the top is stretched, so there is a top layer there. Both are calculated from the bending moment.

A normal slab has no stirrups. It is so wide that the concrete alone can carry the shear. What it does have is a second set of bars, across the main ones, to spread the load and to control the cracks.
Two small things hold all of this together. Spacers keep the bars away from the surface, so that a cover of concrete protects them from rust and from fire. And where one bar ends and the next begins, they overlap for some length, so that the force can pass from one to the other.
So next time you pass a site before the pour, read the cage. Long bars: bending. Loops: shear. Bottom or top: that is where the concrete is stretched.
This is The Bending Moment. Thank you for watching.
The Guide
Handed a set of plans and no one to check your takeoff?
How to Read Structural Drawings follows one beam, B2, from the plan to the section, the schedule and the general notes, then decodes it in the six rebar notations you will meet on real sets. Plans, not slides. Takeoffs, not bid theory.
#5H1616ØT16Ø16N1661 pages · 12 exercises with answers · about 100 abbreviations · PDF · one payment
Photo credits
- Rebar installation for a roof slab: MTA Capital Construction Mega Projects, CC BY 2.0
- Column bars on a foundation: National Park Service, Public domain
- Floor slab mesh: Khaosaming, CC BY-SA 3.0
- Slab reinforcement: Helyesen, CC BY 3.0
Photos from Wikimedia Commons under the licences listed. All drawings are original.
The narration uses an AI clone of the author's own voice. All drawings are original.