Column Reinforcement Explained: Vertical Bars, Ties, Spirals, Laps and Schedules

7 min read · By a practising structural engineer · Updated November 2026

3D view of a column rebar cage rising from a grade beam over a pile
3D illustration: The Bending Moment

Column reinforcement is made of longitudinal (vertical) bars that carry compression and bending together with the concrete, wrapped by ties or a continuous spiral that hold the bars in place, stop them from buckling outward and confine the concrete. The vertical bars are usually spliced just above each floor slab, where the bars from below either lap with new bars or are cranked inward to sit inside the bars above. On the drawings, all of this is read from a column schedule plus a typical column detail.

Longitudinal bars

The vertical bars run the full height of the column, floor by floor. They carry part of the compression and, when the column bends (from wind, earthquake or unbalanced floor loads), the tension on one face.

On drawings they are given as a count and size: 8-#8, 12-#10, or in metric 8T25. Their arrangement around the section is shown in the schedule's section sketch: 4 bars at the corners, 8 bars with 3 per face, and so on. In circular columns they are spaced evenly around a circle.

Bar count and size often drop as you go up the building, because the load is smaller on upper floors. The schedule shows this as different rows for different level ranges, which is where most column takeoff mistakes happen.

Ties and spirals

Ties

Rectangular columns use closed ties (hoops) at a set spacing up the column. Their jobs:

  • keep the vertical bars in position while concrete is placed,
  • prevent the compressed bars from buckling outward,
  • confine the concrete core, which matters a lot in seismic design,
  • carry shear.

Typical ACI 318 rules for tied columns in non-seismic design: the tie spacing must not exceed the least of 16 longitudinal bar diameters, 48 tie bar diameters, and the least dimension of the column. Every corner bar and alternate bar must be held by the corner of a tie, and no unsupported bar may be farther than 6 in (150 mm) clear from a supported bar. Seismic frames have much tighter rules near the joints. These are typical values; the project's general notes and governing code win.

When a column has more bars than one perimeter tie can hold, you will see cross ties or diamond ties in the section sketch. Each one is a separate piece to count.

Spirals

Circular columns often use a continuous spiral instead of separate ties. The drawing gives the spiral bar size and its pitch (the vertical distance between turns), for example #4 SPIRAL @ 2 1/2" PITCH. ACI 318 limits the clear space between spiral turns to between 1 in and 3 in (25 mm to 75 mm) as a typical value. Spirals are counted by height and number of turns, not by pieces.

Laps above the slab and cranked bars

Column bars are not one piece from foundation to roof. They are usually placed one or two storeys at a time and spliced above each floor slab, where the new bars overlap the bars coming up from below.

On the column elevation or typical detail you will see the lap starting at the top of slab, with a length given in the notes or in a lap table (see lap splice length). Some heavy columns use mechanical couplers instead; the drawing will say so.

Cranked (offset) bars

If the lower bars simply ran up beside the upper bars, the upper bars would have to move inward to fit. Instead, the lower bars are usually cranked: bent inward with a short slope just below the slab, so the bar ends sit inside the line of the bars above. Typical ACI 318 rules limit the slope of the inclined part to 1 in 6 against the column axis, and require extra ties near the bend points. When the column face steps in by 3 in (75 mm) or more, offset bending is not allowed and separate dowels are used instead. As always, follow the project details.

lap above slabcrank belowslab, max 1:6slab8-#8, TIE
At each floor the lower bars (red) crank inward below the slab and lap with the upper bars above it. Right: an 18 in column section with 8 bars inside a perimeter tie.

Reading a column schedule

Most commercial sets give columns in a schedule: gridlines or column marks across the top, levels down the side, and a small section sketch in each cell. A simpler tabular version looks like this:

Mark Levels Size Vertical bars Ties Remarks
C1 Footing to L3 18" x 18" 8-#8 #3 @ 16" Perimeter + diamond tie
C1 L3 to Roof 16" x 16" 8-#6 #3 @ 12" Crank or dowel at L3 per detail
C2 Footing to Roof 20" dia. 8-#8 #4 spiral @ 2 1/2" pitch

How to read it:

  1. Find the mark and level range. One mark can have several rows. The level where the size or bars change is where cranks, dowels or new lap lengths appear.
  2. Read size and bars. Check whether the bar count is total or per face; the section sketch settles it.
  3. Read ties. Spacing, tie shape and extra ties (diamond, cross ties). Then check the typical detail for closer spacing at the top and bottom of the column or through the joint.
  4. Find the dowels. Bars connecting the column to the footing are shown in the footing or typical column detail, not always in the column row.

For bar notation, see how to read rebar callouts, and for tie shapes, stirrups and ties.

Worked example: one storey of column C1

Take C1 from the schedule for one storey: 18 in x 18 in (457 mm x 457 mm), 8-#8 verticals, #3 ties at 16 in, perimeter plus diamond tie. Example conditions:

  • Floor-to-floor height 12 ft, slab 8 in thick
  • Lap for #8 column bars from the general notes: 48 in (example value; use your project's notes)
  • Clear cover to ties 1.5 in; 6 in total for tie hooks per the bending schedule

Step 1: check the tie spacing against the typical limits. 16 x 1.0 in (#8 diameter) = 16 in. 48 x 0.375 in (#3 diameter) = 18 in. Least column dimension = 18 in. The smallest is 16 in, which matches the schedule.

Step 2: vertical bars. Each bar covers one storey plus one lap: 12 ft + 4 ft = 16 ft. 8 x 16 = 128 ft of #8 at 2.670 lb/ft = 341.8 lb

Step 3: number of tie sets. Clear height from top of slab to underside of the slab above: 12 ft - 8 in = 136 in. At 16 in: 136 / 16 = 8.5, so 9 spaces and 10 tie sets. (Check the typical detail: some projects require ties through the slab depth or at closer spacing near the ends.)

Step 4: tie lengths. Perimeter tie: 18 - 2 x 1.5 = 15 in per side, 4 x 15 = 60 in + 6 in = 66 in = 5.5 ft. Diamond tie: it connects the 4 middle bars; its side is about 15 / 1.414 = 10.6 in, so 4 x 10.6 = 42.4 in + 6 in = 48.4 in, about 4.0 ft. Per set: 9.5 ft. For 10 sets: 95 ft of #3 at 0.376 lb/ft = 35.7 lb

Step 5: total per column per storey. 341.8 + 35.7 = 377.5 lb (about 171 kg).

Multiply by the number of C1 columns and storeys in that level range. At L3, where C1 shrinks to 16 in, the face steps in by 1 in per side, which is under the typical 3 in limit, so the lower bars can usually be cranked; the detail decides between crank and dowels, and you count accordingly. The complete method is in estimating rebar for columns, and bar weights are in the rebar sizes reference.

Common column reinforcement mistakes

  • Reading the schedule for one level and applying it to the whole height. Bars and ties change by level.
  • Forgetting the lap. Every storey adds a lap length per bar.
  • Counting only perimeter ties when the sketch shows diamond or cross ties.
  • Missing the footing dowels and the extra ties at cranks.
  • Spirals counted as pieces. Count by height, pitch and turns, then add the extra turns the detail requires at each end.

Frequently asked questions

What is the minimum number of bars in a column?

Under typical ACI 318 rules, at least 4 bars in a rectangular or circular column with ties and at least 6 bars with a spiral. Your project's governing code and drawings apply.

Why are column bars spliced just above the slab?

It is a practical point to stop and restart: the lower bars stick up out of the slab, and the next lift of bars is tied to them. Some designs, especially seismic ones, require splices at mid-height instead; the column detail shows where.

What is a cranked bar in a column?

A lower bar bent inward with a short sloped section just below the slab, so it fits inside the bars of the column above where they lap. The slope is limited, typically 1 in 6 under ACI 318.

What is the difference between ties and spirals?

Ties are separate closed hoops at a set spacing, used mainly in rectangular columns. A spiral is one continuous coiled bar at a set pitch, used in circular columns. Spirals confine the concrete more effectively.

How do you read a column schedule?

Find the column mark and level range, then read size, vertical bars and tie or spiral details from that row, using the section sketch for bar arrangement. Changes between rows show where cranks, dowels or new laps are needed.

This article explains general practice for learning purposes. On a real project, the drawings, the general notes and the governing code always win.

Keep reading

The whole library

Free download

The Rebar Callout Cheat Sheet

One printable page: the five questions every callout answers, four labels decoded, and the same bar in six notations. Keep it next to the set of plans.