Why It Fell · No. 12

The Hyatt Regency Walkway Collapse

How One Small Change Killed 114 People

The Hyatt Regency Walkway Collapse: video thumbnailVideo coming soon. Full article below

Kansas City, July 1981. Two walkways hanging in the lobby of a new hotel fall onto a crowded dance. 114 people are killed.

The cause was not a column or a big beam. It was a small change in one connection: one long rod was replaced by two shorter ones, and the load on a single nut doubled. This video shows the original design, the change, why it looked harmless, and why it was not.

4:23 · 5 drawings · video coming soon to the YouTube channel

The full story

Kansas City, July 1981. A new hotel, one year old, with a huge open lobby. Three walkways cross that lobby, high in the air, hanging from the roof on thin steel rods. On a Friday evening, about 1,600 people have come to a dance.

At five past seven, there is a loud crack. The walkway on the fourth floor drops. It lands on the walkway of the second floor, right below it, and both fall onto the crowded floor of the lobby. 114 people are killed, and more than 200 are injured. It is one of the deadliest structural failures in American history.

Each walkway was about 37 metres long, and weighed about 29 tonnes. Across it ran three steel box beams, and each box beam hung on two rods. So everything depended on six small connections: a rod, a nut and a washer, under a beam.

Drawing from the video: The Hyatt Regency Walkway Collapse, figure 1
Fig. 1

In the original design, each rod was one long piece. It came down from the roof, passed through the box beam of the fourth floor, and went on down to the second floor. A nut under the fourth-floor beam carried the fourth-floor walkway. Another nut, at the bottom, carried the second-floor walkway. Each nut held one walkway.

But there was a practical problem. To put a nut halfway up a rod, the thread has to run along the whole lower part of that rod, and it could be damaged when the steel was lifted into place. So the steel fabricator proposed a change. Use two shorter rods instead of one long one. The first rod hangs the fourth-floor walkway from the roof. The second rod starts at the fourth-floor beam, a little to the side, and hangs the second-floor walkway from it.

Drawing from the video: The Hyatt Regency Walkway Collapse, figure 2
Fig. 2

It looks like the same thing. It is not. Imagine two people hanging on one rope, one below the other, each holding the rope with their own hands. Now the lower person lets go of the rope, and holds on to the legs of the upper one instead. The rope carries the same weight as before. But the hands of the upper person now carry two people.

That is what happened to the nut under the fourth-floor beam. In the original design, it carried one walkway. After the change, it carried two. The load on that one connection had doubled, and nobody checked the numbers again.

Drawing from the video: The Hyatt Regency Walkway Collapse, figure 3
Fig. 3

And the beam itself was weak at exactly that point. Each box beam was made of two steel channels, welded together along their edges. The rod passed right through the weld, the weakest line of the beam. Under the double load, the nut and its washer were slowly pulling up through the steel.

The investigation found something worse. Even the original design could carry only about 60 percent of the load that the building code required. The connection as it was built could carry about 30 percent. With a crowd on the walkways, one connection tore through. The others followed in a moment.

Drawing from the video: The Hyatt Regency Walkway Collapse, figure 4
Fig. 4

How does a change like that get through? The fabricator proposed it. The engineer's office approved it by telephone, and later stamped the drawings. Each side believed that the other one had checked the connection. The engineers were found guilty of gross negligence, and lost their licences.

The lesson is taught to every engineering student. The disaster was not in a column, or in a big beam. It was in a detail the size of a hand. A small change in a connection can change the whole path of the load. So every change must go back to the calculation, however small it looks.

Drawing from the video: The Hyatt Regency Walkway Collapse, figure 5
Fig. 5

This is The Bending Moment. Thank you for watching.

The Guide

Handed a set of plans and no one to check your takeoff?

How to Read Structural Drawings follows one beam, B2, from the plan to the section, the schedule and the general notes, then decodes it in the six rebar notations you will meet on real sets. Plans, not slides. Takeoffs, not bid theory.

#5H1616ØT16Ø16N16

61 pages · 12 exercises with answers · about 100 abbreviations · PDF · one payment

See the guide, $9.90

Sources

  • the Wikipedia article "Hyatt Regency walkway collapse" and the works it cites.

Photo credits

  • Box beam and hanger rod after the collapse: figure from the official investigation, US National Archives (NARA 70172360), public domain

Photos from Wikimedia Commons under the licences listed. All drawings are original.

The narration uses an AI clone of the author's own voice. All drawings are original.

Free download

The Rebar Callout Cheat Sheet

One printable page: the five questions every callout answers, four labels decoded, and the same bar in six notations. Keep it next to the set of plans.

Plus a few short emails on reading structural drawings. Unsubscribe any time. Privacy.

On your drawings: from the library

All articles

Free download

The Rebar Callout Cheat Sheet

One printable page: the five questions every callout answers, four labels decoded, and the same bar in six notations. Keep it next to the set of plans.

Plus a few short emails on reading structural drawings. Unsubscribe any time. Privacy.