What Does TOS Mean on Structural Drawings?

3 min read · By a practising structural engineer · Updated November 2026

Ironworkers connect structural steel beams on a building under construction
Photo: PEO ACWA, CC BY 2.0, via Wikimedia Commons

TOS (also written T.O.S.) means top of steel or top of slab, depending on the drawing. On a steel framing plan it is the elevation of the top flange of a beam; on a concrete plan or section it is the elevation of the top surface of the slab.

Where you see TOS on a drawing

On the drawing you will see TOS next to an elevation value, for example T.O.S. EL. 112'-6" or TOS = 100'-0". It appears in a few typical places:

  • Steel framing plans: a note such as TOS 112'-6" UNO sets the top of all beams on that level, with individual beams tagged where they step up or down.
  • Concrete slab plans: TOS 100'-0" marks the finished top of the structural slab, often with local depressions at showers, balconies or mechanical rooms.
  • Sections and wall sections: a level mark with T.O.S. beside it, shown against other marks such as T.O.F. (top of footing) or T.O.W. (top of wall).

The sheet tells you which meaning applies. On a framing plan full of wide-flange beams, TOS is top of steel. On a concrete slab plan, it is top of slab. Some offices avoid the confusion by writing the mark in full, such as TOP OF STEEL or TOP OF SLAB, and the abbreviation list on the general notes sheet should define the term for that set. More level marks are explained in grid lines and elevations on drawings.

How TOS works in practice

In a building with a steel frame and a concrete deck, the two meanings sit close together, and the difference between them is the slab:

Level mark What it refers to Example value
Top of slab (T.O. SLAB) Top surface of the concrete 112'-6"
Top of steel (T.O. STEEL) Top flange of the beam 112'-6" minus the total slab depth on the deck

Worked example

A section shows TOP OF SLAB EL. 112'-6" and a composite slab with a total depth of 6-1/2 in (deck plus concrete) sitting on the beams.

  1. Top of slab: 112'-6" = 1350 in
  2. Total slab depth: 6.5 in
  3. Top of steel: 1350 - 6.5 = 1343.5 in = 111'-11-1/2"

If an estimator read TOS 112'-6" on the framing plan as top of slab, every column height on that level would come out 6-1/2 in short, and every slab edge would be set 6-1/2 in too low. Always check which surface the number belongs to before you use it for heights.

For a takeoff, TOS values give you the heights you need for columns, walls and stair runs: the height of a column between two levels is the difference between the two TOS values, adjusted for slab or beam depth as the details show.

A common mistake

The common mistake is assuming TOS means the same thing on every sheet of the set. On a mixed steel and concrete project, the steel sheets and the concrete sheets can use the same three letters for two surfaces that are several inches apart. The second mistake is missing a local step: one beam or one slab area tagged with a different TOS value. Scan the plan for every elevation tag that differs from the general one before you measure heights. If the set does not define TOS and the sheet does not make it clear, ask the engineer through an RFI. Steel framing plans are covered in how to read structural steel drawings, and other short forms in structural drawing abbreviations.

Frequently asked questions

Is T.O.S. the same as TOS?

Yes. TOS and T.O.S. are two ways of writing the same mark. Check the abbreviation list in the general notes to see whether that set uses it for steel or for slab.

What is the difference between TOS and FFE?

TOS is a structural level: the top of the steel or of the structural slab. FFE (finished floor elevation) usually belongs to the architectural drawings and can sit above the structural slab when there is a topping or floor finish. Do not mix the two when you work out heights.

Why do some beams have a different TOS than the rest of the floor?

Beams step down to make room for a slab depression, a thicker finish, a roof drain slope or a connection. The plan tags those beams with their own TOS value, and those values override the general note for that level.

This article explains general practice for learning purposes. On a real project, the drawings, the general notes and the governing code always win.

Keep reading

The whole library

Free download

The Rebar Callout Cheat Sheet

One printable page: the five questions every callout answers, four labels decoded, and the same bar in six notations. Keep it next to the set of plans.

Plus a few short emails on reading structural drawings. Unsubscribe any time. Privacy.