What Does TOF Mean on Structural Drawings?

TOF (also written T.O.F.) usually means top of footing. It is the elevation of the top surface of a footing, and together with the footing thickness, or the bottom of footing (B.O.F.) elevation, it tells you exactly where the footing sits in the ground.
Where you see TOF on a drawing
On the drawing you will see TOF in three places:
- Foundation plans: a value beside each footing or a general note such as
T.O.F. = -2'-0" UNO, with footings that step down tagged with their own value. - Footing schedules: a column for T.O.F. next to the footing size, thickness and reinforcement.
- Sections and wall sections: a level mark at the top of the footing, often shown with the top of slab and the top of wall above it.
Elevations can be relative, measured from a project zero such as the ground floor slab (0'-0" or 100'-0"), or real survey elevations such as T.O.F. 97.50. The general notes or the first foundation sheet state which datum is used. Reading the whole plan is covered in reading a foundation plan.
How footing depth comes from TOF
The drawing usually gives you two of these three values: TOF, the footing thickness, and BOF. The third follows from simple subtraction:
BOF = TOF - footing thickness
| T.O.F. | Footing thickness | B.O.F. |
|---|---|---|
| -2'-0" | 1'-6" | -3'-6" |
| 97.50 ft | 1.50 ft | 96.00 ft |
| -1'-4" | 2'-0" | -3'-4" |
Worked example
A spread footing F2 is listed in the schedule as 5'-0" x 5'-0" x 1'-6", with T.O.F. -2'-0" below a ground floor slab at 0'-0".
- Bottom of footing: -2'-0" - 1'-6" = -3'-6"
- Depth of excavation below the slab level: 3'-6" (plus any working mud slab or gravel the notes call for)
- Concrete volume: 5 x 5 x 1.5 = 37.5 cu ft
- In cubic yards: 37.5 / 27 = about 1.39 cu yd per footing
The TOF value also sets the length of the dowels or column bars that start in the footing: they run from near the bottom mat, up through the footing and past the TOF into the wall or column above. If the TOF is wrong in your takeoff, every dowel length is wrong too. Volumes for whole footing runs are worked in concrete estimate for footings.
A common mistake
The common mistake is using one TOF for every footing when the plan has steps. On sloping sites, at elevator pits or next to a basement, footings change level, and each step gets its own TOF tag, often with a stepped footing detail. Missing a step changes the excavation depth, the concrete wall height above, and the dowel and wall bar lengths.
The second mistake is mixing datums: reading a relative -2'-0" and a survey 97.50 on the same set as if they were on the same scale. Convert everything to one datum before you compare levels. More on level marks is in grid lines and elevations on drawings.
Frequently asked questions
What does B.O.F. mean?
B.O.F. means bottom of footing: the elevation of the underside of the footing. The difference between T.O.F. and B.O.F. is the footing thickness.
Why is TOF shown as a negative number?
Because the elevation is measured from a project zero, usually the ground floor slab. A footing below that slab has a negative elevation, so T.O.F. -2'-0" means the top of the footing is 2 ft below the zero level.
Is TOF the same as top of foundation?
On some drawings T.O.F. is used for top of foundation, which can mean the top of a foundation wall rather than the footing. The abbreviation list and the section where the mark is shown tell you which surface it points to.
This article explains general practice for learning purposes. On a real project, the drawings, the general notes and the governing code always win.