Structural Drawing Symbols: A Legend You Can Read at the Desk

8 min read · By a practising structural engineer · Updated November 2026

Core wall plan with wall marks and boundary elements
Sheet from the example drawing set in the course

Structural drawing symbols are the small graphic marks that tell you where to look next and what you are looking at: bubbles that send you to a section or detail, circles that name grid lines, triangles that flag revisions, line types that show hidden or cut edges, and hatch patterns that tell concrete from masonry or soil. Most firms use the same family of symbols, but every set has its own legend, usually on the first structural sheet, and that legend wins.

This guide goes through the structural drawing symbols you will meet on almost every set, shows them in one legend, and then follows a footing from the plan to its detail using nothing but the symbols.

Where the symbol legend lives

Before you read anything else, find the legend. On US sets it is usually on S-001 or S-002, next to the general notes and the abbreviations list. On smaller jobs it may sit in a corner of the foundation plan. The legend shows each symbol the engineer used, with one line of explanation.

If there is no structural legend, look at the architectural cover sheet (A-001 or G-001). Many offices share one legend for the whole set. Abbreviations are a separate list, covered in structural drawing abbreviations.

Section bubble

A section mark is a cut line with a circle at the end. The circle is split by a horizontal line: the top half is the section number or letter, the bottom half is the sheet where the section is drawn. A solid triangle or flag on the circle points in the direction you are looking. "3 over S-301" means section 3, drawn on S-301.

Detail bubble

A detail callout is a circle or cloud drawn around the area being enlarged, with a leader line to a split bubble. It reads the same way: detail number on top, sheet below. A dash in the bottom half often means "this sheet", but confirm it in the legend. How the views connect is covered step by step in sections, details and elevations.

View title

Under every section and detail there is a title bubble that repeats the number, gives the name ("TYP. FOOTING AT EXT. WALL") and the scale. Some firms add the sheet it was cut from, so you can go back.

Grid bubble

A circle at the end of a long chain-dot line names a grid line: numbers one way, letters the other. Grid bubbles are not references to other sheets; they are the coordinate system of the building. Read more in grid lines and elevations on drawings.

Elevation marker

On sections and elevations you will see a level marker: usually a small circle divided into quarters with two quarters filled, or a triangle sitting on a line, with text such as "T.O.F. EL. 98'-6"". It marks the height of that line. On plans, a spot elevation is often a small cross or triangle with a number next to it.

North arrow

Every plan should carry a north arrow. Some sets show two: true north and "plan north", a direction chosen so the building sits square on the sheet. When notes say "north wall", they almost always mean plan north.

Revision delta and cloud

A triangle with a number inside (the delta) marks a change made in revision 1, 2, 3 and so on. The changed area is wrapped in a scalloped cloud. The revision block on the title sheet lists each number with a date and description. Revisions and RFIs have their own guide: revision clouds, RFIs and addenda.

3 S301 SECTION 5 S501 DETAIL B GRID T.O.F. 98'-6" ELEV. MARK N NORTH ARROW 2 REV. DELTA BREAK LINE CL CENTERLINE HIDDEN BAR ENDS Symbols vary by firm: the legend on the set governs.
A compact legend: section and detail bubbles, a grid bubble, an elevation mark, north arrow, revision delta, break line, centerline, hidden line, and three bar ends (end tick, hooked end, bar seen end-on).

Line types

Line weight and dash pattern carry as much information as the symbols.

Line Looks like Meaning on a structural sheet
Heavy solid Thick continuous Element cut by the view (wall, slab edge in section)
Light solid Thin continuous Edges seen beyond the cut, dimension lines
Hidden Short dashes Element below or behind, such as footings under a slab on a foundation plan
Centerline Long dash, short dash Center of a column, footing, pier or symmetric element
Grid line Long chain line ending in a bubble Building grid
Break line Line with a zig-zag View is cut short; the element continues
Cloud Scalloped outline Revised area, paired with a delta

Break lines

A break line means "we stopped drawing here, not the element". A wall section may be broken between the footing and the roof to fit the sheet. Never measure across a break line, and never assume the element ends there.

Centerlines

A centerline is drawn long dash, short dash, often labelled with the CL symbol (a C with an L through it). Footings are often located "centered on grid" or by a dimension from the centerline of a column. If a dimension runs to a centerline, add half the element width to get to its face.

Hidden lines

On a foundation plan, the slab is what you see from above, so the footings and grade beams underneath are drawn dashed. New estimators sometimes ignore dashed lines because they look "less important". On a foundation plan, the dashed lines are often the concrete you are pricing.

Bar symbols

Reinforcing bars have their own small vocabulary. On a plan or elevation a bar is a heavy line. Where it is cut in a section, it is a filled dot. A hooked end is drawn as a short turn at the bar end. Many firms mark the end of a straight bar with a short slash or tick so you can see where it stops, which matters at laps. A bar run with arrows or a range line shows the extent over which a spacing applies. The notes beside each bar are explained in how to read rebar callouts.

Hatch patterns for materials

In sections and details, the cut material is filled with a hatch. The patterns below are the common US conventions, but check the legend.

CONCRETE MASONRY/CMU EARTH Common conventions only; check the legend on your set.
Concrete is usually stippled with dots and small triangles (the aggregate), masonry is drawn with diagonal lines, and undisturbed earth with groups of short sloped strokes below the ground line.
Material Common hatch
Cast-in-place concrete Stipple of dots with small triangles
Concrete masonry (CMU) Diagonal lines, often with grouted cells shown as concrete
Brick Diagonal lines, sometimes closer spaced than CMU
Undisturbed earth Short sloped strokes in groups under the grade line
Compacted fill or gravel Small circles or random stones
Steel in section Solid fill or very tight hatch

Worked example: following the symbols to a footing

Here is how the structural drawing symbols carry you from the plan to a quantity.

Step 1, foundation plan S-101. A dashed band runs along grid line A between grids 1 and 4. Dashed means it is below the slab: a continuous footing. A centerline runs down its middle and sits on grid A. Grids 1 to 4 are dimensioned 3 bays at 20'-0", so 60'-0" center to center.

Step 2, section bubble. A cut line across the footing carries a bubble reading 2 over S-301, with the flag pointing north (plan north).

Step 3, section 2/S-301. The footing is hatched as concrete, 2'-0" wide and 1'-0" deep, sitting on earth hatch. A break line cuts the wall above, so the wall height is not shown here. The elevation marker on the footing top reads T.O.F. EL. 97'-0". Reinforcement: 3-#5 continuous bottom, shown as three filled dots.

Step 4, revision. A cloud with delta 1 sits around the bars. The revision block says delta 1 changed the bars from 2-#5 to 3-#5. Without reading the delta you might price an old version taken from an earlier set.

Step 5, numbers. Treat the run as the grid-to-grid length, 60'-0", before you add the corner returns from the typical details.

  • Concrete: 2.0 ft x 1.0 ft x 60 ft = 120 ft³ = 4.44 yd³ (about 3.40 m³).
  • Bars: 3 x 60 ft = 180 ft of #5. At 1.043 lb/ft: 180 x 1.043 = 187.7 lb, before laps, corner bars and waste.

Check both with the concrete calculator and the rebar weight calculator. The laps and corner bars come from the typical details, which have no bubble at all; see typical details and hidden rebar.

Common mistakes with structural drawing symbols

  • Reading the bubble upside down. Top is the view, bottom is the sheet.
  • Ignoring the arrow on a section mark. It tells you which side you are looking from, which decides near face and far face.
  • Measuring across a break line. The element is longer than it looks.
  • Skipping dashed lines on a foundation plan. That is where the footings are.
  • Missing a delta. A clouded change on one sheet can change bars, sizes or levels everywhere the detail is used.
  • Assuming a hatch. If something looks like masonry but the legend says otherwise, the legend is right.

For the order to read the whole set in, start with how to read structural drawings.

Frequently asked questions

What do the numbers in a section bubble mean?

The top number or letter identifies the section, and the bottom gives the sheet where it is drawn. A bubble reading 4 over S-302 sends you to section 4 on sheet S-302. The flag on the bubble shows the viewing direction.

What does a triangle with a number mean on a drawing?

It is a revision delta. The number is the revision in which that area changed, and the change itself is usually wrapped in a cloud. The revision block on the title sheet lists each revision number with its date and description.

What do dashed lines mean on a structural plan?

Short dashed lines are hidden lines: elements below or behind the plane you are looking at. On a foundation plan they usually show footings and grade beams under the slab. A long dash, short dash pattern is a centerline or grid line, not a hidden line.

How is concrete shown in a section?

Cast-in-place concrete is usually hatched with a stipple of dots and small triangles, which represent the aggregate. Masonry is drawn with diagonal lines. Firms vary, so check the symbol legend on the first structural sheet.

Are structural drawing symbols standardized?

There are widely shared conventions, and many US firms follow the US National CAD Standard for sheet layout and symbols. Each office still adapts them, which is why every set should carry its own legend. When the legend and your habit disagree, follow the legend.

This article explains general practice for learning purposes. On a real project, the drawings, the general notes and the governing code always win.

Keep reading

The whole library

Free download

The Rebar Callout Cheat Sheet

One printable page: the five questions every callout answers, four labels decoded, and the same bar in six notations. Keep it next to the set of plans.

Plus a few short emails on reading structural drawings. Unsubscribe any time. Privacy.