Rebar Chairs, Bolsters, Spacers and Couplers: What They Are and How to Estimate Them

8 min read · By a practising structural engineer · Updated November 2026

3D view of zig-zag chair bars standing on a slab bottom mesh
3D illustration: The Bending Moment

Rebar chairs are the supports that hold reinforcing bars at the right height in the forms until the concrete is placed, so the cover shown on the drawings is actually achieved. The family of rebar accessories also includes slab bolsters, high chairs, side spacers, concrete blocks, tie wire and mechanical couplers. Accessories are not drawn bar by bar, so estimators either count them from the support layout the specification requires, or carry them as an allowance based on their own past jobs.

Why chairs and supports matter

Every bar on a drawing has a position: a cover from the bottom, a height for the top mat, a distance from the form face. Without supports, workers walking on the steel and the weight of wet concrete push the bars down. A bottom mat lying on the subgrade has almost no cover, and a top mat pushed down loses its lever arm. Supports are what make the cover on the drawing real. Typical cover values and where to find them are in concrete cover.

Types of rebar chairs and supports

The Concrete Reinforcing Steel Institute (CRSI) publishes the standard for bar supports in the US, with a set of symbols used on placing drawings. Common ones:

Support Common CRSI symbol What it does
Slab bolster SB Continuous wire support with legs, under the bottom bars of slabs
Slab bolster upper SBU Slab bolster with a runner wire along the bottom of the legs
Beam bolster BB Continuous support under the bottom bars of beams
Individual bar chair BC Single chair holding one bar or an intersection
Joist chair JC Chair for joist and narrow rib construction
Individual high chair HC Tall chair for the top mat of slabs
Continuous high chair CHC Continuous tall support under the top mat

Symbols and heights vary by manufacturer and edition of the standard, so check the supplier's catalog. On placing drawings the support is usually called out with the symbol and the height, for example "CHC 6" @ 4'-0"."

Materials and protection classes

Wire supports touch the form, so their feet would rust at the concrete surface if left bare. CRSI groups wire supports by protection class: Class 1 is plastic protected, Class 1A is epoxy or plastic coated for use with epoxy coated bars, Class 2 is stainless steel protected, and Class 3 has no protection and is only for places where rust spots do not matter or the supports do not touch an exposed surface. Supports are also made entirely of plastic, or of precast concrete.

Concrete blocks (dobies)

On slabs on ground and footings, the bottom bars are often set on precast concrete blocks, sometimes with a tie wire cast in. Blocks do not sink into soft subgrade the way thin wire legs do. In the UK and many metric markets, "spacer" and "dobie" are common names for these.

Side spacers

Walls and columns need cover at the side forms. Plastic wheel spacers clip onto the vertical or horizontal bars and roll against the form. They are counted per area of wall face or per column, depending on the specification.

SLAB BOLSTER (SB)HIGH CHAIR (CHC)TOP MATBOTTOM MAT
A two-mat slab: the slab bolster sets the bottom cover, the high chair carries the top mat at its height.

Tie wire

Bars are tied at intersections with soft annealed wire, usually supplied in coils. Plain black wire is used with plain bars, and coated wire with epoxy coated or galvanized bars, as the specification requires. Not every intersection is tied; the tying pattern is a placing practice set by the specification and the placer. For estimating, tie wire is almost always carried as an allowance per ton of bar placed, from the company's own records.

Couplers and mechanical splices

A mechanical splice joins two bars end to end with a coupler instead of a lap. Engineers use them where bars are large, where a lap would be too long or too congested, at construction joints where bars must be threaded through a form, and in some seismic details. Common types include threaded couplers, swaged sleeves and grout-filled sleeves. Headed bars (a plate or forged head on the bar end) are a related product used for anchorage instead of hooks.

ACI 318 classifies mechanical splices as Type 1, which must develop at least 1.25 times the specified yield strength of the bar, and Type 2, which must also develop the bar's specified tensile strength. Type 2 is what you will usually see required in the critical zones of seismic frames. The drawing or specification will name the type, and sometimes the manufacturer.

For the takeoff, couplers are counted as items (each), by bar size and type. Do not add a lap length where a coupler is shown, and note that threaded systems may need the bar ends prepared by the fabricator. Where laps are replaced by couplers, see lap splice length for the laps you no longer count.

How to estimate rebar accessories

There are two honest ways to price accessories, and good estimators use both: one to price, the other to check.

Method 1: count from the required layout

Find the support requirements in the specification or general notes. They usually state support types and maximum spacings, or refer to the CRSI standard and the placing drawings. Then lay out the supports like bars:

  1. Decide which direction the support lines run. A slab bolster runs perpendicular to the bars it carries.
  2. Count the lines: roundup(length / support spacing) + 1, the same rule used in rebar spacing.
  3. Multiply by the length of each line for continuous supports, or by the number of chairs per line for individual chairs.
  4. Convert to the supplier's piece length or box quantity.
  5. Repeat for each layer: bottom mat, top mat, beams, walls.

Method 2: allowance from history

Many contractors carry accessories as an allowance per ton of rebar or per square foot of slab, built from their own completed jobs. This is fast, and it reflects real site practice. Its weakness is that it hides unusual jobs: a thick mat foundation with tall high chairs, or an epoxy job needing coated supports, can cost far more per ton than an ordinary slab. A count (Method 1) on the unusual areas protects you.

No universal rate exists, and published rates from elsewhere are not a substitute for your own records or a supplier quote.

Worked example: supports for a two-mat slab

An elevated slab panel is 30 ft x 40 ft, 10 in thick, with a bottom mat and a top mat. For this example, the specification calls for continuous slab bolsters (SB) under the bottom mat and continuous high chairs (CHC) under the top mat, both at a maximum spacing of 4 ft, with the first line 6 in from the slab edge. (These are example values from a project specification, not a standard.)

Step 1: direction. The lowest bars of the bottom mat run in the 40 ft direction. The bolsters run across them, in the 30 ft direction, and are spaced along the 40 ft length.

Step 2: number of SB lines. Distance between the first and last lines: 40 ft - 2 x 0.5 ft = 39 ft. 39 / 4 = 9.75, round up to 10, plus 1 = 11 lines.

Step 3: length of each line. 30 ft - 2 x 0.5 ft = 29 ft.

Step 4: total SB. 11 x 29 = 319 linear ft of slab bolster at the bottom cover height.

Step 5: high chairs. The same layout under the top mat gives another 11 lines x 29 ft = 319 linear ft of CHC, at the height that puts the top mat where the section shows it.

Step 6: order quantity. Divide each total by the supplier's piece length and round up per line, because a line cannot use a fraction of a piece left over from another line unless the pieces are cut. If the supplier sells 5 ft pieces, each 29 ft line needs 6 pieces, so 11 x 6 = 66 pieces of SB and 66 pieces of CHC.

Then add the edge and opening supports shown on the placing drawings, and supports for any beams in the panel (beam bolsters under the beam bottom bars). This is a small slab, but the method scales: on a full floor, the counts come from the same few lines of arithmetic.

Where accessories hide in the drawings

  • General notes: "Support all reinforcing on approved chairs per CRSI" or a specific spacing.
  • Specification: the reinforcing section lists support materials, classes and coatings.
  • Typical details: a slab detail may show a chair height or a "standee" for a thick mat.
  • Mat foundations: thick mats need heavy top mat supports, often fabricated from bar. Those are bars, and they belong in the rebar takeoff with a mark of their own. More on hidden bars in typical details hiding rebar.

Frequently asked questions

What is a rebar chair?

A rebar chair is a support, usually wire or plastic, that holds a bar or mat at the correct height in the form so the concrete cover is achieved. Chairs come in individual and continuous forms and in many heights.

What is the difference between a slab bolster and a high chair?

A slab bolster is a low continuous support under the bottom bars of a slab, setting the bottom cover. A high chair is a taller support that carries the top mat at its height above the bottom mat.

How many rebar chairs do I need per square foot?

There is no universal number. Take the support type and maximum spacing from the specification or placing drawings, then count lines with roundup(length / spacing) + 1, like bars. Many contractors also keep an allowance from their own past jobs as a check.

What is a Type 2 mechanical splice?

Under ACI 318, a Type 2 mechanical splice must develop the specified tensile strength of the bar, in addition to 1.25 times its specified yield strength. It is the type usually required in the critical zones of seismic frames.

Do I include tie wire in a rebar estimate?

Yes, but as an allowance, not a count. Tie wire is usually carried per ton of bar placed, based on the company's own records, with coated wire priced separately where the bars are coated.

This article explains general practice for learning purposes. On a real project, the drawings, the general notes and the governing code always win.

Keep reading

The whole library

Free download

The Rebar Callout Cheat Sheet

One printable page: the five questions every callout answers, four labels decoded, and the same bar in six notations. Keep it next to the set of plans.

Plus a few short emails on reading structural drawings. Unsubscribe any time. Privacy.