Rebar Spacing: What "@ 12 in O.C." Means and How to Count Bars

Rebar spacing is the distance from the center of one bar to the center of the next, written on drawings as "@" (at) followed by a distance, usually with "O.C." (on center). "#4 @ 12" O.C." means #4 bars with 12 in between their centers. To count bars across a width, take the width minus the cover at both edges, divide by the spacing, round up, and add one.
Reading spacing on a drawing
On a plan or section you will see callouts like these:
| Callout | Meaning |
|---|---|
| #4 @ 12" O.C. | #4 bars, 12 in center to center |
| #5 @ 10" O.C. E.W. | #5 bars at 10 in, each way (both directions) |
| #5 @ 12" O.C. E.F. | #5 bars at 12 in, each face (both faces of a wall) |
| #4 @ 16" T&B | #4 at 16 in, top and bottom layers |
| H12 @ 200 / H12-200 | 12 mm high-yield bars at 200 mm centers (UK style) |
| Ø12 @ 200 c/c | 12 mm bars at 200 mm center to center (common metric style) |
"On center" is the key phrase: spacing is never the clear gap between bars, it is center to center. The full notation is covered in how to read rebar callouts, and the abbreviations in structural drawing abbreviations.
Each way, each face, top and bottom
These three abbreviations multiply your count, and they are where many takeoffs go wrong.
- E.W. (each way) means the same callout applies in both directions. A slab "#4 @ 12" E.W." has one set of bars running east-west and another running north-south.
- E.F. (each face) is used for walls: one curtain of bars on each face. Double the count.
- T&B (top and bottom) is used for slabs and mats: two layers. Double the count again if it is also E.W.
A mat foundation called "#6 @ 12" E.W. T&B" has four layers of bars.
How to count bars from the rebar spacing
The bars sit inside the concrete, not at its edge. The first bar is placed at the cover distance from the edge, the last bar at the cover distance from the opposite edge, and the rest are spaced in between.
number of bars = roundup( (width - 2 x cover) / spacing ) + 1
Why round up? Because if the division leaves a remainder, the last gap would be larger than the specified rebar spacing. Spacing on a drawing is a maximum, so you add a bar rather than stretch a gap. Why add one? Because spacing counts the gaps, and there is always one more bar than gaps.
Some detailers and specifications place the first bar at half a spacing from the edge, or at a fixed distance. If the drawing or a typical detail shows a different start distance, use it. For an estimate, the cover method above is the common default and gives a safe count.
Worked example: a slab with #4 @ 12 in E.W.
A slab panel is 24 ft x 36 ft. The plan says "#4 @ 12" O.C. E.W." in a single bottom layer. The general notes give 2 in of cover at the slab edges. Stock bars are 40 ft, so no bar needs a lap here.
Bars running the 36 ft direction (spread across the 24 ft width)
- Width: 24 ft = 288 in
- 288 - 2 x 2 = 284 in
- 284 / 12 = 23.67, round up to 24
- 24 + 1 = 25 bars
- Length of each: 36 ft - 2 x 2 in = 35.67 ft
Bars running the 24 ft direction (spread across the 36 ft length)
- 36 ft = 432 in
- 432 - 4 = 428 in
- 428 / 12 = 35.67, round up to 36
- 36 + 1 = 37 bars
- Length of each: 24 ft - 4 in = 23.67 ft
Total length and weight
- 25 x 35.67 = 891.8 ft
- 37 x 23.67 = 875.8 ft
- Total: 1,767.6 ft of #4
-
4 weighs 0.668 lb/ft: 1,767.6 x 0.668 = 1,181 lb (about 536 kg)
If the slab were "T&B," you would double this. If the panel were longer than a stock bar, you would add laps, as shown in lap splice length. The complete slab method, including openings and edge bars, is in rebar estimate for slabs. You can check bar weights with the rebar weight calculator.
A quick check on the answer
A useful sanity check: a single layer of #4 @ 12 in each way is two bars per foot of width, one in each direction. That is about 2 x 0.668 = 1.34 lb per square foot before laps and edge effects. The panel is 24 x 36 = 864 sq ft, so 864 x 1.34 = 1,154 lb. The detailed count (1,181 lb) is a little higher because of the extra bar from rounding up and adding one in each direction. If your count is far from the quick check, look for a mistake.
Rounding: always up
The most common counting error is rounding to the nearest whole number. Take a 10 ft wide footing with #5 @ 10 in and 3 in cover: (120 - 6) / 10 = 11.4. Rounding to the nearest gives 11, then 12 bars, and leaves one gap of 14 in, wider than the specified 10 in. The correct count is roundup(11.4) + 1 = 13 bars.
When the division comes out exact, you do not round at all. The same 10 ft footing with bars @ 6 in gives 114 / 6 = 19.0, so 19 + 1 = 20 bars.
Minimum clear spacing
The rebar spacing on drawings is set by the engineer for strength and crack control, but there is also a lower limit: bars cannot be so close that concrete and aggregate cannot flow between them. That limit is on the clear spacing, the gap between the outside surfaces of adjacent bars.
For bars in a horizontal layer in beams and slabs, ACI 318 sets the minimum clear spacing as the greatest of:
- 1 in (25 mm)
- one bar diameter
- 4/3 times the nominal maximum aggregate size
For column vertical bars, the minimum is the greatest of 1.5 in, 1.5 bar diameters and 4/3 times the maximum aggregate size. When bars are in two or more layers, the bars of the upper layer sit directly above the bars below, with at least 1 in clear between layers.
These are typical ACI 318 values. Other codes (Eurocode 2, BS 8110, IS 456) use similar ideas with their own numbers, and the project's general notes and governing code win. For an estimator, minimum spacing matters in one practical way: if bars on a congested section look closer than these limits, there may be a drawing error worth a question. Maximum spacing limits also exist; the engineer checks those in design.
Spacing and cover together
Cover is the concrete between the bar surface and the face of the concrete. It sets where the first bar can sit, so it enters every count. The typical cover values and where to find them on drawings are in concrete cover. For metric drawings, note that cover is in millimeters and spacing in millimeters, so a 6 m wide slab with H12 @ 200 and 40 mm cover gives roundup((6000 - 80) / 200) + 1 = roundup(29.6) + 1 = 31 bars.
Frequently asked questions
What does 12 inches on center mean for rebar?
It means the centers of adjacent bars are 12 in apart. It is not the clear gap between bars. A callout such as "#4 @ 12" O.C." gives the bar size and that center-to-center distance.
How do you calculate the number of rebars in a slab?
For each direction, take the width the bars are spread across, subtract the cover at both edges, divide by the spacing, round up and add one. Multiply by two if the callout says each way, and again for top and bottom layers.
Why do you add 1 when counting rebar?
Dividing by the spacing gives the number of gaps between bars. A row always has one more bar than gaps, so you add one.
What is the minimum spacing between rebar?
Under ACI 318, the minimum clear spacing between parallel bars in a layer is the greatest of 1 in, one bar diameter and 4/3 of the maximum aggregate size. Columns use 1.5 in and 1.5 bar diameters instead. The project's general notes and governing code take priority.
What does E.W. mean on a rebar drawing?
E.W. means each way: the same bar size and spacing run in both directions. A slab with "#4 @ 12" E.W." has two sets of bars at right angles to each other.
This article explains general practice for learning purposes. On a real project, the drawings, the general notes and the governing code always win.