How to Read a Framing Plan: Beam Tags, Slab Callouts and Openings

How to read a framing plan comes down to a fixed order: start with the grid and the level the plan represents, then identify every beam by its tag and look it up in the beam schedule, read the slab callouts for thickness and type, and find every opening, step and elevation change. The framing plan tells you where each member is and what it is called; schedules, sections and details tell you what is inside it.
Every floor and the roof of a multi-storey building gets its own framing plan, so framing plans are among the sheets you will spend the most time on. This guide covers how to read a framing plan for both concrete and steel buildings, then works one small concrete bay into quantities.
What a framing plan shows
A framing plan is a horizontal view of one level of the structure: the beams, slabs, joists, columns and walls that support that floor or roof. It is titled by level, for example "SECOND FLOOR FRAMING PLAN" or "ROOF FRAMING PLAN", and the sheets usually run in order up the building (S-102, S-103, S-104 and so on).
On the sheet you will find:
- The grid with bubbles and dimension strings, the same grid as the foundation plan.
- Columns and walls that support the level, usually shown cut and hatched or filled.
- Beams and girders, each with a tag.
- Slab or deck callouts giving thickness and type.
- Openings for stairs, shafts, ducts and elevators.
- Elevations: top of slab (T.O.S.) or top of steel, and any steps or depressions.
- Section cuts and detail bubbles that send you to other sheets.
- Plan notes, which often hold the default slab thickness, default T.O.S. and references to typical details.
If grids and level marks are new to you, read grid lines and elevations on drawings first.
Concrete framing plans
On a cast-in-place concrete framing plan you are looking down at the top of the slab. Beams below the slab are hidden from that viewpoint, so they are usually drawn with dashed lines. Columns and walls are usually drawn where they are cut, with hatching or a solid fill to show concrete.
Beam tags
Each beam carries a tag such as B1, B2 or 2B5 (where the first digit can mean the floor). The tag points to the beam schedule, which gives the size and the bars. Some plans write the size next to the tag, for example "B2 (14x20)", meaning 14 in wide by 20 in deep. Whether the 20 in is the overall depth or the depth below the slab is a project convention, and the general notes or the beam section settle it. A common mistake is to assume one and double count the slab.
Slab callouts
Slabs are labelled with a mark (S1, S2) pointing to a slab schedule, or with a direct note such as "6" SLAB". A note like "6" SLAB UNO" in the plan notes covers every slab without a mark, and only the exceptions are tagged. Slab reinforcement is often drawn on a separate sheet; see reading a slab reinforcement plan.
Openings, steps and depressions
An opening is normally drawn as a rectangle with an X through it, dimensioned from the nearest grid. The bars that stop at the opening and the extra trim bars around it are usually in a typical detail, not on the plan. Depressed slabs (at bathrooms, balconies or toppings) are shown with a boundary line and a note like "DEPRESS 2"" or a separate T.O.S. elevation.
Steel framing plans
A steel framing plan looks similar but carries different information.
- Members as single lines. Each beam is a single line from support to support, with its size written along it, such as W16x26. See what W12x26 means if the designation is new.
- Shear stud counts. On composite floors a number in brackets or parentheses next to the size, such as W16x26 (20), commonly gives the number of shear studs. The notes or legend define the format, so check them.
- Camber. A note such as "c = 3/4"" tells the fabricator to camber the beam.
- Connections. Moment connections and other special end conditions are marked with a symbol defined in the legend.
- Deck. An arrow or hatched strip shows the span direction of the metal deck, with a note on deck type and the concrete topping.
- Joists. Roofs and light floors often use open web steel joists, tagged with designations like 18K5 and a spacing.
For a rebar or concrete estimator, a steel building still has concrete on its framing plans: the slab on deck, its mesh or bars, any extra top bars over girders, slab edges and pour stops. The steel itself is priced by someone else. More on reading the steel side is in how to read structural steel drawings.
| Item | Concrete framing plan | Steel framing plan |
|---|---|---|
| Beams | Dashed outline (below slab), tag such as B2 | Single line, size such as W16x26 |
| Beam information | In the beam schedule | Written on the plan |
| Slab | Thickness callout or slab mark | Deck type plus topping note |
| Reinforcement | Beam schedule, slab plans, details | Mesh or bars in the deck slab notes |
| Elevation shown | T.O.S. (top of slab) | Top of steel, often with slab elevation |
| Extra notes | Depressions, drop panels, openings | Studs, camber, connections, joist spacing |
Floor framing plan vs roof framing plan
The roof framing plan is read the same way, with a few additions. Roofs often slope, so the plan carries several top-of-steel or top-of-slab elevations, or a slope note. Mechanical units sit on the roof, so look for openings, curbs and dunnage framing with their own tags. In concrete roofs, parapets and upturned edge beams appear as walls or beams at the slab edge, and each one has a section.
Worked example: reading one concrete bay
This is how to read a framing plan in practice, on an invented example. The plan above shows one bay of a second floor framing plan:
- Grid 1 to 2 is 24'-0". Columns are 16" × 16", centred on the grids.
- Beam B2 runs along grid A between the columns, tagged "B2 (14x20)". The general notes say beam depths are overall, including the slab.
- The slab is 6" thick (the plan note says "6" SLAB UNO").
- In the next bay there is an opening 4'-0" × 3'-0", with a bubble 4 over S-501. Typical detail 4/S-501 says: "2 #5 each side of opening, extend 2'-0" beyond opening at each end."
Step 1: clear span of the beam
The grid dimension is centre to centre of columns. Each column face is 8" from the grid, so the clear span between column faces is 24'-0" − 8" − 8" = 22'-8" (22.667 ft).
Step 2: concrete in the beam below the slab
The beam is 20" overall and the slab is 6", so the part below the slab (the stem) is 20 − 6 = 14" deep. The stem is 14" wide.
Stem volume = 14/12 ft × 14/12 ft × 22.667 ft = 1.1667 × 1.1667 × 22.667 = 30.85 ft³, or 30.85 / 27 = 1.14 yd³ (about 0.87 m³).
The slab concrete over the beam is already in the slab quantity, which is why you take only the stem. If the notes had said depths are below the slab, the stem would be the full 20" and the answer would change.
Step 3: the opening
The opening removes concrete from the slab: 4 ft × 3 ft × 0.5 ft = 6.0 ft³ (0.22 yd³). Small, but on a floor with a dozen shafts and duct openings, the deductions add up.
Step 4: trim bars from the typical detail
Two bars on each of the four sides, each extended 2'-0" past the opening at both ends:
- Long sides: 4'-0" + 2 × 2'-0" = 8'-0". 2 sides × 2 bars = 4 bars, 4 × 8 = 32 ft.
- Short sides: 3'-0" + 2 × 2'-0" = 7'-0". 2 sides × 2 bars = 4 bars, 4 × 7 = 28 ft.
Total 60 ft of #5 (16 mm). At 1.043 lb/ft: 60 × 1.043 = 62.6 lb for this one opening. None of these bars is drawn on the framing plan. You only find them by following the bubble. More on this kind of hidden steel in typical details and hidden rebar, and you can check the weight with the rebar weight calculator.
Step 5: what is still missing
The B2 bars and stirrups come from the beam schedule, and the slab bars from the slab reinforcement plan. The framing plan gave you the geometry and the pointers. That is its job.
How to read a framing plan in eight steps
- Confirm the level in the sheet title and the T.O.S. or top of steel in the notes.
- Read the plan notes for defaults: slab thickness, T.O.S., typical details.
- Check the grid against the foundation plan. The dimensions should match.
- List every beam tag and count each one, grid line by grid line.
- Look up each tag in the schedule.
- Mark every opening, depression, step and slab edge that is off grid.
- Follow every section and detail bubble.
- Compare with the plan of the level below and above. A column or wall that stops or starts changes what you count.
Common mistakes when reading a framing plan
- Counting the slab twice by taking the full beam depth when the slab is already in the slab quantity.
- Missing the "UNO" default, so every untagged slab is taken at the wrong thickness.
- Using the wrong level. Typical floor plans often say "2ND TO 5TH FLOOR". That one sheet is four floors.
- Ignoring openings and their trim bars, because the bars are only in a detail.
- Reading dashed lines as "future" or "by others". On a concrete framing plan, dashed usually just means below the slab. The legend confirms it.
Frequently asked questions
What is the difference between a floor plan and a framing plan?
An architectural floor plan shows rooms, walls, doors and finishes. A structural framing plan shows only the load-carrying members of that level: beams, slabs, joists, columns and structural walls, with their tags and elevations. Estimators take structure from the framing plan and use the floor plan only for context.
Why are beams dashed on a concrete framing plan?
The plan is drawn looking down at the top of the slab. Beams below the slab are hidden from that view, so they are drawn with dashed lines, which is the usual drawing convention for hidden edges. The legend or general notes on the first structural sheet confirm the convention for your set.
What does the number in brackets after a steel beam size mean?
On many composite steel framing plans, a number such as (20) after W16x26 is the number of shear studs on that beam. The format is not universal, so check the framing plan notes or the legend before you rely on it.
Does the framing plan show the slab reinforcement?
Sometimes, as a note, but usually not in full. Most concrete sets put slab bars on separate slab reinforcement plans or in a slab schedule, and the framing plan only gives the slab thickness, mark and elevation.
This article explains general practice for learning purposes. On a real project, the drawings, the general notes and the governing code always win.