How to Read a Beam Schedule: Top and Bottom Bars, Stirrups and the Beam Elevation

7 min read · By a practising structural engineer · Updated November 2026

Beam elevation sheet showing stirrups and top and bottom bars
Sheet from the example drawing set in the course

A beam schedule is a table that lists each beam mark with its size, its top bars and bottom bars at the left support, midspan and right support, and its stirrups. To read it, find the beam mark on the framing plan, then picture the beam in elevation: the "left" and "right" columns describe the bars over the supports, the "mid" column describes the bars in the middle of the span, and the typical beam detail tells you how far each bar extends.

The schedule is short; the information it carries is not. This article explains each column of a typical beam schedule and then turns one row into bars with lengths and weights.

Beam marks on the framing plan

Beams are marked on the framing plan of each floor: B1, B2, or with a level prefix such as 2B1 for a beam on level 2. Beams with the same mark are identical. The plan also gives you the spans (grid to grid), the support types (columns, walls, other beams) and the direction, which tells you which end is "left".

Offices differ on which end is "left". Some schedules use "end 1" and "end 2", or name the grid lines. Check the legend before assigning bars to ends, especially for beams that are not symmetrical.

What the columns of a beam schedule mean

Column Typical entry Meaning
Mark B1 Beam type, repeated on the plan
Size (b × h) 12" × 24" Width × overall depth
Top, left 2 #5 + 2 #7 Bars in the top at the left support
Top, mid 2 #5 Bars in the top at midspan
Top, right 2 #5 + 2 #7 Bars in the top at the right support
Bottom 3 #6 Bars in the bottom, often continuous
Stirrups #3 @ 10" Stirrup size and spacing
Remarks See 2/S-502 Special details

Some schedules split the bottom into left, mid and right too, and some list stirrups by zone ("#3: 1 @ 2", 8 @ 6", rest @ 10"").

Top bars: left, mid, right

Over the supports a continuous beam hogs, so the top is in tension and needs more steel there. At midspan the top often only needs a couple of bars to hold the stirrups and carry what moment is left. That is why the top entries change along the beam.

The key question is whether the support entry is the total at that point or in addition to the midspan bars. In the table above, "2 #5 + 2 #7" means the 2 #5 continue through, and 2 #7 are added. Other schedules write only the total ("4 bars") and leave you to work out which ones run through. The schedule legend or typical detail settles it. A common mistake is to count the continuous bars twice: once in the support entry and once in the mid entry.

Bottom bars

At midspan the bottom is in tension, so the main bottom bars are there. They usually run the full span and extend a set distance into the supports. Where a schedule shows more bottom bars at midspan than at the ends, the extra bars are shorter bars in the middle of the span that stop before the supports. For the structural reasons, see beam reinforcement explained and the video on shear and bending moment diagrams.

Stirrups

"#3 @ 10"" means #3 closed or open stirrups every 10 inches. Zoned stirrups are tighter near the supports, where shear is highest. The first stirrup is usually placed a short distance from the face of the support; that distance is in the typical detail. See stirrups and ties for shapes and hooks.

From the schedule to the beam elevation

The schedule gives counts and sizes. Lengths come from the typical beam detail, a standard elevation that shows how far top bars extend from the support face, how bottom bars end at the supports, where laps may occur, and where the first stirrup goes. Those extents may be given as a fixed length, a fraction of the clear span, or by bar mark.

6'-0"LEFTMIDRIGHT3 #6 BOT CONT2 #5 TOP CONT+ 2 #7 TOP AT SUPPORTS#3 @ 10"
Beam B1 in elevation: the schedule's left, mid and right entries become continuous top bars, additional top bars over each support and continuous bottom bars. Only some stirrups are drawn.

Worked example: turning beam B1 into bars

This is an invented example. The framing plan shows four beams marked B1, each spanning 24'-0" centre to centre between 16" × 16" columns. The schedule row reads:

Mark Size Top L Top M Top R Bottom Stirrups
B1 12" × 24" 2 #5 + 2 #7 2 #5 2 #5 + 2 #7 3 #6 #3 @ 10"

The project's typical beam detail (values for this example) says:

  • Continuous top bars run through both columns to 2 in from the outer face and turn down a 1'-0" hook leg.
  • Additional top bars extend 6'-0" from the face of the support into the span, and are anchored through the column the same way.
  • Bottom bars extend 6 in into each support.
  • First stirrup 2 in from the face of the support. Stirrups at 1.5 in cover, 4 in added for each of the two hooks.

Clear span = 24'-0" − 8 in − 8 in = 22'-8" = 272 in.

Step 1: continuous top bars, 2 #5

From each column centreline to 2 in from the outer face = 8 − 2 = 6 in.

Length = 24'-0" + 6 in + 6 in + 2 × 1'-0" hook = 27.0 ft.

Per beam: 2 × 27.0 = 54.0 ft.

Step 2: additional top bars, 2 #7 at each end

Length = 6'-0" into the span + 1'-2" through the column (16 − 2 in) + 1'-0" hook = 8'-2" = 8.167 ft.

Per beam: 4 bars × 8.167 = 32.67 ft.

Step 3: bottom bars, 3 #6

Length = 22'-8" + 6 in + 6 in = 23'-8" = 23.67 ft.

Per beam: 3 × 23.67 = 71.0 ft.

Step 4: stirrups, #3 @ 10"

Count = (272 − 2 − 2) ÷ 10 = 26.8, round up to 27 spaces, + 1 = 28 stirrups.

Length: outside dimensions 12 − 3 = 9 in by 24 − 3 = 21 in. Perimeter = 2 × (9 + 21) = 60 in. Add 2 × 4 in = 68 in = 5.67 ft.

Per beam: 28 × 68 in = 1,904 in = 158.67 ft.

Step 5: weights for four beams

Item Bar Ft per beam Ft for 4 beams lb/ft Weight (lb)
Top continuous #5 54.00 216.0 1.043 225.3
Top additional #7 32.67 130.7 2.044 267.1
Bottom #6 71.00 284.0 1.502 426.6
Stirrups #3 158.67 634.7 0.376 238.6
Total 1,157.6

Bar weights are the standard ASTM A615 values. The full beam takeoff method, including laps on long beams and continuous beams over several spans, is in how to estimate rebar for beams.

Common traps when reading beam schedules

  • Left and right swapped. On a beam with different supports at each end, assigning the heavy top bars to the wrong end changes lengths if the spans differ.
  • Continuous bars counted twice, as described above.
  • Continuous beams over several spans. One schedule row may describe a beam with three spans. The support entries then apply at every interior support, and the top bars over an interior support extend into both adjacent spans.
  • Side face bars. Deep beams often have extra longitudinal bars on the side faces, sometimes listed in a separate column or only in the typical detail.
  • Beam depth versus slab. The schedule gives overall depth. Where the beam is cast with the slab, the stirrup height still uses the overall depth, but the slab's own bars are separate.
  • Unit and size notation. Some schedules give b × h, others h × b. Read the heading.

Frequently asked questions

What do left, mid and right mean in a beam schedule?

They describe the bars at the left support, at midspan and at the right support. Top bars are heaviest over the supports and bottom bars at midspan. The typical beam detail says how far each set extends.

How do I know how long the top bars are?

The schedule usually does not say. Lengths come from the typical beam detail, given as a fixed distance from the support face, a fraction of the clear span, or by bar mark in a bar list. Always use the project's detail rather than a general rule.

Is the support entry in addition to the midspan bars?

It depends on the schedule's convention. Some write "2 #5 + 2 #7" to show the added bars clearly, others give only the total at that point. Check the schedule legend or typical detail before counting.

What does #3 @ 10" mean for beam stirrups?

It means #3 (10 mm) stirrups spaced 10 inches apart along the beam. If spacing changes along the span, the schedule lists zones or refers to a detail, with tighter spacing near the supports.

This article explains general practice for learning purposes. On a real project, the drawings, the general notes and the governing code always win.

Keep reading

The whole library

Free download

The Rebar Callout Cheat Sheet

One printable page: the five questions every callout answers, four labels decoded, and the same bar in six notations. Keep it next to the set of plans.

Plus a few short emails on reading structural drawings. Unsubscribe any time. Privacy.