What Does UNO Mean on Structural Drawings?

UNO means unless noted otherwise. It marks a default: the note applies everywhere on the drawing or project, except at locations where another note, detail or schedule says something different.
Where you see UNO on a drawing
On the drawing you will see UNO (also written U.N.O., UON or "unless otherwise noted") in two kinds of places:
- Plan notes, for example
SLAB: 6" THICK W/ #4 @ 16" EW, UNOwritten once on a floor plan. Every area of slab gets that, except the areas marked with a different thickness or different bars. - General notes, for example
ALL CONCRETE COVER 1-1/2" UNOorLAP SPLICES CLASS B UNO. These set project-wide defaults that specific details can override.
UNO and TYP often appear together, as in #5 CORNER BARS TYP UNO. TYP says the condition repeats everywhere; UNO says there are exceptions you must look for. See what TYP means.
What UNO changes in a takeoff
UNO sets the default you price for most of the element, and then sends you hunting for the exceptions. In a takeoff the method is:
- Write down the UNO default.
- Scan the plans, sections and schedules for every "noted otherwise" location.
- Take off the exceptions separately.
- Price the default for everything that is left.
Worked example
A floor plan has the note SLAB: #4 @ 16" EW, UNO. Two areas carry their own callout: a 200 sq ft area at a mechanical room marked #5 @ 12" EW, and a 150 sq ft area at a loading zone marked #5 @ 10" EW. The full slab is 4,000 sq ft.
| Area | Size | Reinforcement |
|---|---|---|
| Mechanical room (noted) | 200 sq ft | #5 @ 12" EW |
| Loading zone (noted) | 150 sq ft | #5 @ 10" EW |
| Everything else (UNO default) | 4,000 - 200 - 150 = 3,650 sq ft | #4 @ 16" EW |
If you had priced the whole 4,000 sq ft at the UNO default, the two heavier areas would be under-priced. If you had added the exceptions on top of the full 4,000 sq ft, you would have counted 350 sq ft twice. The slab reinforcement plan article shows how these zones are usually drawn.
A common mistake
The most common mistake is stopping at the UNO note and never looking for the "otherwise". The exceptions are often on a different sheet: a section, an enlarged plan, a schedule, or a detail referenced from somewhere else. A second mistake is assuming a UNO note on one sheet covers the whole project. A plan note normally covers that plan; a general note covers the project. When the scope is not clear, it is worth an RFI.
A good habit is to keep a list of every UNO default you find on the general notes sheet (cover, lap class, hook type, concrete strength) and check each specific detail against it.
Frequently asked questions
Is UNO the same as UON?
Yes. UNO (unless noted otherwise) and UON (unless otherwise noted) mean the same thing. Some sets write U.N.O. with periods, and some write the phrase out in full.
What wins, a UNO note or a specific detail?
The specific detail. That is the whole point of UNO: the note is a default, and anything noted otherwise at a particular location replaces it there.
Where are UNO defaults usually found?
On the general notes sheet and as notes on the plan sheets. Cover, lap splice class, concrete strength and typical slab reinforcement are common UNO defaults.
This article explains general practice for learning purposes. On a real project, the drawings, the general notes and the governing code always win.