What Does Ld Mean on Structural Drawings?

3 min read · By a practising structural engineer · Updated November 2026

3D view of a beam cage with its top bars bent down into a column joint
3D illustration: The Bending Moment

Ld means development length: the length a bar must be embedded in concrete beyond a point to develop its full strength through bond. On drawings you see it as a required extension, for example a bar that runs "Ld past the face of support".

Where you see Ld on a drawing

On the drawing you will see Ld in a few forms:

  • On details and sections: a bar drawn past a support or into a footing with the dimension Ld instead of a number.
  • In the general notes or a lap and development table: a schedule giving Ld for each bar size, often split by top bars and other bars and by concrete strength.
  • With a subscript: Ldh for a bar that ends in a standard hook, and Ldc for a bar in compression. ACI 318 writes these as ℓd, ℓdh and ℓdc.

Ld is not a single fixed number. It depends on the bar size, concrete strength, steel grade, cover, spacing, bar position and coating, and the governing code sets how it is calculated. That is why the value you use comes from the project's general notes or the table on the drawings, not from memory. Those tables are explained in general notes on structural drawings.

Ld is not a lap splice

Development length and lap splice length are related but they are not the same thing:

Development length (Ld) Lap splice length
What it does Anchors one bar so it can reach its full force Transfers force from one bar to another bar
Where you use it Bar past a support, into a footing, into a wall or column Where two bars overlap to make a longer run
How it is set From the code or the project table Often a multiple of Ld; under ACI 318, a Class B tension splice is 1.3 Ld

The project table usually lists both, so read the right column. Laps are covered in lap splice length.

Worked example

A beam detail shows top bars (3) #6 T over an interior column 18 in wide, with each bar extending Ld past the face of the column on both sides. The project table gives Ld = 36 in for #6 top bars.

  1. Extension left of the column: 36 in
  2. Column width: 18 in
  3. Extension right of the column: 36 in
  4. Bar length: 36 + 18 + 36 = 90 in = 7'-6"
  5. Total for 3 bars: 3 x 7.5 ft = 22.5 ft

If the same notes call for Class B tension splices and give only Ld, the lap for that bar is 1.3 x 36 = 46.8 in, which you would round up to 47 in, or to the next whole inch the notes ask for.

A common mistake

The common mistake is using the lap length where the drawing says Ld, or the other way round. Laps are usually longer, so using a lap where Ld is called for overprices the job a little, while using Ld where a lap is needed underprices every splice in the building. The second mistake is using a straight Ld where the detail shows a hook: a hooked bar uses Ldh, which is shorter, and the hook itself adds bar length. Hooks and development are in rebar hooks and development length.

When the drawings show Ld but no table gives a value, do not guess a number. Ask the engineer through an RFI.

Frequently asked questions

Is Ld the same for top bars and bottom bars?

Often not. Under ACI 318, horizontal bars with a large depth of fresh concrete cast below them, usually top bars, get a longer development length. Project tables often list "top bars" and "other bars" separately for this reason.

What does Ldh mean?

Ldh is the development length of a bar that ends in a standard hook. It is measured from the critical section to the outside edge of the hook and is shorter than the straight Ld for the same bar.

Who decides the Ld value?

The engineer of record, working to the governing code. The value reaches the estimator through the general notes, a lap and development table, or a dimension on the detail.

This article explains general practice for learning purposes. On a real project, the drawings, the general notes and the governing code always win.

Keep reading

The whole library

Free download

The Rebar Callout Cheat Sheet

One printable page: the five questions every callout answers, four labels decoded, and the same bar in six notations. Keep it next to the set of plans.

Plus a few short emails on reading structural drawings. Unsubscribe any time. Privacy.