CLR means clear. A note like 3" CLR tells you the clear distance from the face of the concrete to the outside surface of the nearest bar. It is the concrete cover, measured to the bar's surface, not to its center.

Where you see CLR on a drawing

On the drawing you will see CLR mostly on sections and details, with a short dimension line from the concrete face to the bar:

  • Footings: 3" CLR at the bottom and sides
  • Walls: 2" CLR on the earth face, 1-1/2" CLR on the inside face
  • Slabs: 3/4" CLR top
  • Beams and columns: 1-1/2" CLR TO TIES

The general notes usually set the default cover for each kind of element, and the detail may override it. CLR can also describe a gap between bars or between two layers, for example 1" CLR BETWEEN LAYERS. Typical values and why cover matters are in concrete cover.

What CLR changes in a takeoff

Clear cover sets the length of every bar. A bar cannot run the full length of the concrete: it stops short by the cover at each end. It also sets the depth where top and bottom mats sit, which matters for chairs and for bent bars.

Worked example

A footing is 8 ft (96 in) long with straight bottom bars and 3" CLR all around.

  1. Footing length: 96 in
  2. Cover at both ends: 2 x 3 in = 6 in
  3. Bar length: 96 - 6 = 90 in = 7 ft 6 in
Footing length CLR each end Bar length
8 ft 0 in 3 in 7 ft 6 in
4 ft 0 in 3 in 3 ft 6 in
20 ft 0 in 3 in 19 ft 6 in

For a beam with 1-1/2" CLR TO TIES, the cover is measured to the outside of the stirrup, so the main bars sit further in by one stirrup diameter. It also sets the outside dimensions of the stirrups you cut. See the rebar cut length formula.

A common mistake

The most common mistake is treating CLR as a distance to the bar center. If you set a bar out at 3 in to its center, the real cover is 3 in minus half a bar diameter, which is less than the engineer asked for. The second mistake is ignoring cover in the takeoff altogether and measuring bars to the full concrete size. On one bar the difference is a few inches; across a whole mat it adds up, and in a tight element a bar measured to full size simply will not fit.

Also watch which bar the cover is measured to. In a beam or column, the CLR usually refers to the ties or stirrups, the outermost bars, not the main bars.

Frequently asked questions

Is CLR the same as cover?

In most cases yes: 3" CLR on a section is the concrete cover. CLR can also be used for any clear gap, such as the space between two layers of bars, so read what the dimension line points to.

Is clear cover measured to the stirrup or the main bar?

To the outermost bar, which in beams and columns is normally the stirrup or tie. Some details state it explicitly, such as "CLR TO TIES". The project's notes and governing code decide.

Why is cover larger on footings?

Concrete cast against earth needs more cover to protect the steel. Footings and the earth face of walls usually have larger cover than formed interior faces. The general notes give the values for the project.

This article explains general practice for learning purposes. On a real project, the drawings, the general notes and the governing code always win.

Keep reading

The whole library

Free download

The Rebar Callout Cheat Sheet

One printable page: the five questions every callout answers, four labels decoded, and the same bar in six notations. Keep it next to the set of plans.

Plus a few short emails on reading structural drawings. Unsubscribe any time. Privacy.