How to Read a Wall Section: Footing, Wall Bars, Slab Ties and Elevations

8 min read · By a practising structural engineer · Updated November 2026

Basement wall section drawing with bars and notes
Sheet from the example drawing set in the course

A wall section is a vertical cut through a wall that shows its full height: the footing at the bottom, the wall thickness, the bars in each face, how the wall connects to the slabs and floors, and the elevations at the top and bottom. How to read a wall section comes down to working from the bottom up: the elevations first, then the footing, then the wall bars face by face, then every connection to a slab. The section gives the shape and the bars for one typical metre or foot of wall; you multiply by the wall length from the plan.

This guide explains how to read a wall section on a structural set, how it differs from a wall detail and from the architect's wall section, and then turns a basement wall section into quantities.

Wall section vs detail

Both are cuts, so the difference is about extent and scale.

  • A wall section shows the whole height of the wall, from below the footing to the top of the wall, usually at 1/2" or 3/4" = 1'-0" (around 1:20 in metric sets). It gives the overall picture: sizes, levels, bar sizes and spacings.
  • A wall detail enlarges one part of it, such as the corner where the wall meets the footing or the connection at the top of the wall, at a larger scale. When a section gets too crowded, the designer draws a detail bubble on it and sends you elsewhere.

On the plan, a section cut through the wall with a bubble like 2 over S-301 points to the wall section. The way these bubbles work is covered in section vs detail vs elevation.

The architect's wall section

The architectural set also has wall sections, usually through the exterior wall from foundation to roof. They show the building envelope: cladding, insulation, membranes, windows, floor and roof build-ups. They are useful for context, such as where the finished floor sits and how thick the topping is, but the structural wall section is the one that carries reinforcement. If the two disagree on a level or a thickness, that is a question for the design team, not a choice for the estimator. See architectural vs structural drawings.

How to read a wall section as an estimator

Work through it from the bottom up.

Elevations

Look for top of footing (T/F), bottom of footing (B/F), top of wall (T/W) and the slab levels on each side. The wall height you price is T/W minus T/F. If the plan shows several T/W elevations along the wall, for example where the grade steps, the section is typical and you apply it to each length with its own height.

Footing

The section gives the footing width and depth, the bars across the footing (transverse) and the bars along it (longitudinal, often marked CONT). Some sections show a shear key, a recess in the top of the footing that the wall locks into.

Dowels

Wall bars are rarely cast in one piece with the footing. Instead, dowels are set in the footing and project up to lap with the wall bars. The section shows the dowel size and spacing, the hook at the bottom, the embedment, and how far the dowel extends above the footing. Dowels are separate bars and a separate line on the takeoff.

Wall bars face by face

The callouts tell you which bars are in which face. Typical notations:

Callout Meaning
#5 @ 12" VERT EF Vertical bars at 12" in each face, so two sets
#5 @ 12" VERT IF Vertical bars at inside face only
#4 @ 12" HORIZ OF Horizontal bars at outside face only
2" CLR Clear cover from the face to the nearest bar
CONT Continuous: lap the bars along the full length

EF (each face) doubles the quantity compared with a single face, and it is the most expensive abbreviation to misread on a wall. More on these terms in what EF means and how to read rebar callouts.

Ties to the slab

Where a slab meets the wall, the section shows how they connect. A slab on grade may simply sit against the wall with an isolation joint, or be tied in with dowels from the wall. A suspended slab may bear on the wall, or the wall bars may hook into the slab. Each connection bar is counted separately, and each one is easy to miss because it is drawn small at the edge of the section.

What is not rebar

Waterproofing, drainage board, waterstops at construction joints and backfill notes appear on the same section. Read them so you understand the sequence, but they are not in the rebar or concrete quantity.

WALL SECTION (NTS)#5@12 VERT IF#5@12 DOWEL#4@12 HORIZT/W 100'-8"T/F 92'-0"4" SOG#4@24 SLAB DOWELFTG 3'-0" x 1'-0"3 #5 CONT, #5@12
A basement wall section from bottom up: footing bars, a hooked dowel lapping with the inside-face vertical bars, horizontal bars shown as dots, and a dowel tying the slab on grade into the wall. Drawn not to scale.

Worked example: a basement wall section into quantities

This is how to read a wall section into a takeoff, on an invented example. The foundation plan shows a straight basement wall 40'-0" long between two construction joints, with the section above. The section gives:

  • T/F = 92'-0", T/W = 100'-8".
  • Wall 10" thick. #5 @ 12" vertical, inside face only, running from the top of the footing to 2" below the top of the wall. #4 @ 12" horizontal. 2" clear cover.
  • Footing 3'-0" wide × 1'-0" deep, 3 #5 continuous, #5 @ 12" transverse, 3" cover.
  • Dowels #5 @ 12": 9" down into the footing, a 1'-0" hook leg, and 2'-6" above the top of footing to lap with the vertical bars.
  • Slab dowels #4 @ 24": 2'-6" long overall.

Step 1: wall height

T/W − T/F = 100'-8" − 92'-0" = 8'-8" (104 in).

Step 2: footing bars

  • Longitudinal: 40'-0" − 2 × 3" = 39'-6". 3 bars × 39.5 ft = 118.5 ft × 1.043 lb/ft = 123.6 lb.
  • Transverse: spacing along 39'-6" = 474 in / 12 = 39.5, round up to 40 spaces, so 41 bars. Length 3'-0" − 2 × 3" = 2'-6". 41 × 2.5 = 102.5 ft × 1.043 = 106.9 lb.

Step 3: dowels

Length per dowel: 2'-6" + 0'-9" + 1'-0" = 4'-3" (4.25 ft). Count along the wall: 40'-0" − 2 × 2" = 476 in / 12 = 39.7, round up to 40 spaces, 41 dowels. 41 × 4.25 = 174.25 ft × 1.043 = 181.7 lb.

Step 4: vertical bars

Length: 8'-8" − 2" = 8'-6" (8.5 ft). Same spacing as the dowels: 41 bars. 41 × 8.5 = 348.5 ft × 1.043 = 363.5 lb.

Step 5: horizontal bars

Count over the height: 104 in / 12 = 8.7, round up to 9 spaces, 10 bars. Length 40'-0" − 2 × 2" = 39'-8" (39.667 ft), which fits in one 40 ft stock bar, so no lap here. 10 × 39.667 = 396.7 ft × 0.668 = 265.0 lb.

Step 6: slab dowels

40'-0" / 2'-0" = 20 spaces, 21 dowels. 21 × 2.5 = 52.5 ft × 0.668 = 35.1 lb.

Step 7: totals

Item Bars Length (ft) Total ft lb/ft Weight (lb)
Footing longitudinal #5 3 39.50 118.5 1.043 123.6
Footing transverse #5 41 2.50 102.5 1.043 106.9
Dowels #5 41 4.25 174.3 1.043 181.7
Wall vertical #5 41 8.50 348.5 1.043 363.5
Wall horizontal #4 10 39.67 396.7 0.668 265.0
Slab dowels #4 21 2.50 52.5 0.668 35.1

Total 1,075.8 lb for 40 ft of wall. If the callout had said EF instead of IF, the vertical and horizontal lines would double and the total would rise by 628.5 lb, before any extra dowels for the second face. Concrete for the same length: footing 3 × 1 × 40 = 120 ft³ (4.44 yd³), wall 10/12 × 8.667 × 40 = 288.9 ft³ (10.70 yd³). Check the numbers with the rebar weight calculator and the concrete calculator.

The cover, hook and lap values above belong to this invented section. On a real job they come from the section and the general notes, which always win. The full method for walls is in how to estimate rebar for walls, and walls that hold back soil on one side are in rebar estimate for a retaining wall.

Common mistakes when reading a wall section

  • Missing EF. Each face means two layers.
  • Pricing the section as the whole wall. The section is one typical cut. Corners, wall ends, openings and steps in the footing all add bars from typical details.
  • Forgetting the dowels because they look like the bottom of the vertical bars.
  • Using one height for a wall whose top or bottom steps. Split the wall by height.
  • Skipping slab connection bars, which are drawn small at the edge of the section.

Frequently asked questions

What is a wall section in construction drawings?

It is a vertical cut through a wall showing its full height, from the footing to the top of the wall. On structural drawings it gives sizes, elevations and reinforcement; on architectural drawings it shows the build-up of the wall assembly, insulation and finishes.

What is the difference between a wall section and a wall elevation?

A wall section cuts through the wall and shows its thickness and the bars inside. A wall elevation looks at the face of the wall without cutting it, and shows its length, openings, steps and joints. Estimators need both: the section for bars per foot, the elevation for lengths and openings.

What do IF and OF mean on a wall section?

IF means inside face and OF means outside face. They say which face of the wall the bars are in. EF means each face, so the bars are in both.

Why are there dowels between the footing and the wall?

The footing is usually poured before the wall. Dowels cast into the footing project up and lap with the wall bars, so the two pours act together. They are separate bars with their own length and count on the takeoff.

This article explains general practice for learning purposes. On a real project, the drawings, the general notes and the governing code always win.

Keep reading

The whole library

Free download

The Rebar Callout Cheat Sheet

One printable page: the five questions every callout answers, four labels decoded, and the same bar in six notations. Keep it next to the set of plans.

Plus a few short emails on reading structural drawings. Unsubscribe any time. Privacy.