Concrete Control Joints: Spacing, Saw-Cut Depth and What Happens to the Rebar

9 min read · By a practising structural engineer · Updated November 2026

A worker uses a groover to place control joints in a fresh concrete sidewalk
Photo: U.S. Navy photo, Public domain, via Wikimedia Commons

Concrete control joints are planned weakened lines, saw-cut or tooled into a slab, that make shrinkage cracks form in a straight line where you want them instead of wandering across the floor. A common rule of thumb is a joint depth of one quarter of the slab thickness and a joint spacing of 24 to 36 times the slab thickness, but the slab plan and the project notes decide both. For the estimator, the joint detail matters most: it tells you whether the bars or mesh run through each joint or stop at it.

Control joints are also called contraction joints. On some drawings the tag is CJ, which is also used for construction joints, so read the legend first. The construction joints and rebar article covers the other meaning.

Why concrete control joints exist

Concrete shrinks as it dries. A slab on grade is held back by friction with the base under it, so shrinkage builds up tension, and concrete is weak in tension. The slab will crack whether or not it is reinforced; reinforcement controls how wide the crack opens, not whether it forms.

Concrete control joints give the crack a place to go. The cut reduces the section, so the slab cracks through the bottom of the cut, where the crack is straight, hidden and easy to seal. Without joints the same cracking shows up as random lines across the floor.

tSAW CUT t/4CONTROL JOINT (SECTION)CRACK FORMS BELOW CUTVAPOR RETARDERMAT PER DETAIL
A saw-cut control joint: the cut weakens the section, and the shrinkage crack forms straight down from the bottom of the cut. Whether the reinforcement crosses the joint is set by the joint detail.

How control joints are shown on slab plans

On the drawing you will see control joints in one of three ways:

  1. Drawn on the slab plan. Thin lines, often dashed or chain-dotted, across the slab, with a tag and a dimension string giving the spacing.
  2. A note only. For example "CONTROL JOINTS AT 15'-0" O.C. MAX EACH WAY, SEE DETAIL 4/S501". The layout is then up to the contractor within that rule, sometimes with a joint layout submittal.
  3. Architectural floor finish drawings, where a polished or finished floor needs a coordinated joint pattern. The structural detail still governs depth and reinforcement.

The joint detail, usually on a typical details sheet, shows the depth of cut, the joint filler or sealant if any, and what the reinforcement does. Read it together with the general notes for timing and curing requirements.

Control joint spacing: rules of thumb

The engineer sets the spacing, and it depends on slab thickness, the concrete mix, the reinforcement and the use of the floor. The rules of thumb below are widely published for unreinforced or lightly reinforced slabs on grade. They are not a substitute for the drawings.

Item Published guidance Source
Maximum joint spacing 24 to 36 times the slab thickness NRMCA
Upper limit added to that ratio 15 ft (4.6 m) NRMCA
Joint spacing commonly used 24 to 30 times the slab thickness PCA
Panel shape Close to square; long side not more than 1.5 times the short side NRMCA
Joint depth One quarter of slab thickness, not less than 1 in (25 mm) NRMCA, PCA
Saw cutting time As soon as the concrete can be cut without ravelling; within hours, not days PCA, NRMCA

So a 4 in (100 mm) slab gives 96 to 144 in, or 8 to 12 ft (2.4 to 3.7 m) between joints, and a 6 in (150 mm) slab gives 12 to 18 ft, capped at 15 ft by the NRMCA recommendation. Slabs with heavier reinforcement, post-tensioning or shrinkage-compensating concrete can be designed with much longer spacing; that is the engineer's decision, shown on the drawings.

Two layout points come up on most plans:

  • Re-entrant corners. Where the slab has an inside corner (an L-shaped floor, a pit, a column block-out), a crack tends to start from the corner. Joints are usually run out from those corners, and some details add short diagonal bars there.
  • Joint alignment. Joints are lined up with columns and with joints in adjacent pours where possible. A joint that dead-ends in the middle of a panel tends to keep going as a crack.

Saw-cut depth and timing

A conventional saw cut is made a few hours after finishing, once the concrete is hard enough not to ravel at the edge of the blade. The depth of one quarter of the slab thickness is the figure you will see in most notes: 1-1/4 in (32 mm) for a 5 in slab, 1-1/2 in (38 mm) for a 6 in slab.

Early-entry saws are run sooner, while the concrete is still green, and they cut shallower. If the notes allow early-entry sawing they will state the depth.

Tooled joints are formed with a groover while the concrete is plastic, mostly on sidewalks and driveways. Timing matters because the slab starts to shrink early: a cut made too late can find a crack already formed beside it.

What happens to the rebar or mesh at a control joint

This is the part that changes the takeoff. Details do one of the following:

Detail What you see on the detail Effect on the takeoff
Reinforcement continuous through the joint Mat drawn straight through the cut No change; take the slab off as one run
Reinforcement stopped at each joint Bars end a short distance each side of the joint line Each panel gets its own bars; more, shorter pieces, no laps
Every other bar cut at the joint Alternate bars stopped, the others continuous Half the bars run through, half are panel-length
Dowels across the joint Smooth dowels at a spacing, mat stopped Dowels are an extra line item along every joint

Continuous reinforcement holds the crack under the cut tight, but it also restrains the joint so it may not open where intended. Stopped reinforcement lets the joint work freely, with load transfer from aggregate interlock or dowels. The engineer picks one; the estimator follows the detail.

Welded wire follows the same logic. Some details cut every other wire at the joint. If the detail says nothing about the mesh, raise an RFI rather than guess. See welded wire reinforcement for how mesh is counted.

Worked example: a 60 ft x 90 ft slab with control joints

This is an invented example. A slab on grade is 60'-0" x 90'-0" (18.3 m x 27.4 m), 5 in (125 mm) thick, reinforced with #4 @ 18" O.C. E.W., 3 in clear to the slab edges. Stock length is 20 ft, lap 2'-0" (example value; use the lap from your project's notes).

Step 1: check the joint spacing on the plan

Rule of thumb: 24 x 5 in = 120 in = 10 ft, and 36 x 5 in = 180 in = 15 ft. The plan shows joints at 15'-0" each way, at the top of that range and equal to the 15 ft cap.

Panels: 60 / 15 = 4 across, 90 / 15 = 6 along, so 4 x 6 = 24 panels of 15 x 15 ft. Square panels, aspect ratio 1.0.

Step 2: length of saw cut

Interior joint lines running the 90 ft direction: 4 − 1 = 3 lines x 90 ft = 270 ft. Interior joint lines running the 60 ft direction: 6 − 1 = 5 lines x 60 ft = 300 ft. Total = 570 linear ft of saw cut, at a depth of 5 / 4 = 1-1/4 in.

Saw cutting is usually the concrete contractor's item, but those 570 ft are also where any dowels or bar ends occur.

Step 3: bars running the 90 ft direction, continuous detail

Bars are spaced across the 60 ft width: 60 x 12 − 2 x 3 = 714 in. Spaces = 714 / 18 = 39.7, round up to 40. Bars = 41 rows.

Run per row = 90 − 0.5 = 89.5 ft. With 20 ft bars and 2 ft laps, each bar after the first adds 18 ft: 5 bars cover 20 + 4 x 18 = 92 ft, so 4 laps.

Length per row = 89.5 + 4 x 2 = 97.5 ft. Total = 41 x 97.5 = 3,997.5 ft.

Step 4: the same bars, stopped at each joint

Now suppose the detail stops the bars 2 in from each side of every control joint. Each row breaks into 6 pieces, one per panel:

  • 2 end pieces: 15 ft − 3 in edge cover − 2 in at the joint = 15 − 0.417 = 14.583 ft each.
  • 4 interior pieces: 15 ft − 2 in − 2 in = 15 − 0.333 = 14.667 ft each.

Length per row = 2 x 14.583 + 4 x 14.667 = 29.167 + 58.667 = 87.833 ft, with no laps. Total = 41 x 87.833 = 3,601.2 ft.

Step 5: compare

Case Length of #4 Weight at 0.668 lb/ft Pieces in this direction
Continuous through joints 3,997.5 ft 2,670 lb 41 x 5 = 205
Stopped at each joint 3,601.2 ft 2,406 lb 41 x 6 = 246

The stopped detail uses about 264 lb less bar in this direction, but it has 41 more pieces to cut and place, and each 14'-8" piece cut from a 20 ft stock bar leaves a 5'-4" offcut. Unless those offcuts are used elsewhere, the saving on paper turns into waste in the yard. This is why the joint detail has to be read before the bar list is built, and why your waste factor should reflect the cut pattern; see rebar waste factor.

The bars in the 60 ft direction are treated the same way. Weights are the standard ASTM A615 values; the rebar weight calculator converts any length.

Common mistakes

  • Reading CJ as the wrong joint. Check the legend: control joint and construction joint share the abbreviation on some sets.
  • Taking the mat off as continuous without opening the joint detail. Stopped bars or dowels at 570 ft of joint is a real quantity.
  • Ignoring joints set by a note. "15'-0" max each way" still means joints.

Concrete control joints are a small part of the drawing set and a real part of the bar list. For the full slab method, see the slab on grade reinforcement guide.

Frequently asked questions

How far apart should control joints be in a concrete slab?

A widely published rule of thumb is 24 to 36 times the slab thickness, with NRMCA also recommending no more than 15 ft. For a 4 in slab that is about 8 to 12 ft. The spacing on the drawings governs, and reinforced or post-tensioned slabs may be designed with much longer spacing.

How deep should a control joint be cut?

The usual guidance is one quarter of the slab thickness, and not less than 1 in. That is 1-1/4 in for a 5 in slab. Early-entry saw cuts are shallower, and the project notes state the depth if they are allowed.

Does rebar go through control joints?

It depends on the design. Some details run the reinforcement straight through, some stop it at each joint, some cut every other bar, and some add smooth dowels. The joint detail decides, and it changes the rebar takeoff.

What is the difference between a control joint and an expansion joint?

A control joint is a partial-depth cut that makes the slab crack in a chosen place. An expansion or isolation joint is a full-depth separation with compressible filler that lets two parts move independently. See isolation and expansion joints for details.

This article explains general practice for learning purposes. On a real project, the drawings, the general notes and the governing code always win.

Keep reading

The whole library

Free download

The Rebar Callout Cheat Sheet

One printable page: the five questions every callout answers, four labels decoded, and the same bar in six notations. Keep it next to the set of plans.

Plus a few short emails on reading structural drawings. Unsubscribe any time. Privacy.