A bar bending schedule (BBS) is a table that lists every reinforcing bar in an element by bar mark, with its size, number of bars, cut length and bend shape. The fabricator cuts and bends from it, the fixer places from it, and the estimator can check quantities against it. Each row is one bar mark, and the shape code plus the dimension columns (A, B, C...) tell you exactly how that bar is bent.

This guide walks through the columns of a bar bending schedule, how cut lengths are calculated, and a full worked check of a small footing schedule.

What a bar bending schedule is for

The structural drawings say what reinforcement is needed: "H16 @ 200 B1 and B2" or "7-#5 EW BOT". A bar bending schedule turns that into a shopping and cutting list. Every bar that is different in size, length or shape gets its own bar mark, and the schedule records how many of each are needed.

On UK, Commonwealth, Gulf and Indian projects the BBS is often produced by the designer or a detailer and issued with the drawings, typically in the BS 8666 format. In the US, the equivalent is the bar list that the rebar detailer prepares with the placing drawings, following the CRSI and ACI detailing conventions. The idea is the same: one line per bar mark.

The columns of a bar bending schedule

A schedule in the BS 8666 style has these columns:

Column What it means Example
Member The element the bars belong to Pad footing F1
Bar mark Unique ID, matching the mark on the drawing 01
Type and size Steel type letter plus diameter in mm H16
No. of members How many identical elements 4
No. of bars in each Bars of this mark in one element 22
Total no. Members x bars in each 88
Length of each bar Cut length in mm 1850
Shape code Standard shape (see below) 00
A, B, C, D, E/r Bending dimensions in mm A = 1850
Rev Revision letter A

A US bar list carries the same information in a slightly different layout: mark, quantity, size (#5), total length in feet and inches, bend type, and the bending dimensions. Many bar lists also show the weight per mark.

Bar mark

The bar mark is the link between the drawing and the schedule. On a UK-style drawing the callout "22 H16-01-200 B1" includes mark 01. Every bar with the same size, shape and dimensions can share a mark, even if they appear in several members.

Type and size

On BS 8666 schedules the letter in front of the diameter gives the steel type. H is the common one, meaning high-yield bar to the specified grade (B500 under BS 4449). So H16 is a 16 mm high-yield bar. In the US the size column shows the bar number, such as #5.

Shape code and dimensions

The shape code says which standard shape the bar is bent to: 00 for straight, 11 for a single 90 degree bend, 21 for a U, and so on. The A, B, C, D columns give the leg lengths for that shape. The meaning of each code is explained in rebar shape codes.

00 A 11 A B 21 A B C
Three common BS 8666 shapes. Dimensions are taken to the outside of the bar, and the cut length is less than the sum of the legs because of the bends.

How cut length is calculated

A bent bar does not need the full sum of its outside dimensions, because the bar follows a curve at every bend. BS 8666 gives a total-length formula for each shape code. In the 2005 edition, which many schedules still follow, the formulas for the three simplest shapes are:

Shape code Description Total length L
00 Straight L = A
11 One 90 degree bend L = A + B - 0.5r - d
21 Two 90 degree bends (U) L = A + B + C - r - 2d

Here d is the bar diameter and r is the bend radius used for scheduling. The BS 8666:2005 minimum scheduling radius for B500 bars is 2d for bars of 16 mm and smaller and 3.5d for 20 mm and larger, which gives values such as:

Bar size (mm) 10 12 16 20 25 32
Min. scheduling radius r (mm) 20 24 32 70 87 112

BS 8666 was revised in 2020 and some formulas and shapes were amended, so use the edition your project specifies. In the US, bar lists give bending dimensions out-to-out and the fabricator works to CRSI bending practice; the project's notes and the governing code decide the hook and bend details.

Worked example: checking a footing schedule

Four identical pad footings, F1, each 2000 x 2000 x 500 mm. The drawing calls for:

  • Bottom mat: H16 @ 200 each way, straight, 75 mm cover.
  • Column starters: 4 H20 L-bars, 1500 mm vertical leg, 400 mm foot.
  • Top edge U-bars: 8 H12, legs 300 / 500 / 300 mm.

Mark 01, bottom mat, shape 00.

  • Length: 2000 - 2 x 75 = 1850 mm.
  • Bars per direction: the bars spread across 1850 mm. 1850 / 200 = 9.25, round up to 10 spaces, so 11 bars.
  • Bars in each footing: 11 x 2 directions = 22.
  • Total: 4 footings x 22 = 88 bars.

Mark 02, starters, shape 11.

  • A = 1500, B = 400, d = 20, r = 70.
  • L = 1500 + 400 - 0.5 x 70 - 20 = 1900 - 35 - 20 = 1845 mm.
  • Total: 4 x 4 = 16 bars.

Mark 03, U-bars, shape 21.

  • A = 300, B = 500, C = 300, d = 12, r = 24.
  • L = 300 + 500 + 300 - 24 - 2 x 12 = 1100 - 48 = 1052 mm.
  • Total: 4 x 8 = 32 bars.

The finished schedule:

Member Mark Type & size No. mbrs No. in each Total no. Length (mm) Shape A B C
F1 01 H16 4 22 88 1850 00 1850
F1 02 H20 4 4 16 1845 11 1500 400
F1 03 H12 4 8 32 1052 21 300 500 300

Weights. Metric bar mass is d² / 162 kg/m:

  • H16: 16² / 162 = 1.580 kg/m. 88 x 1.850 = 162.8 m. 162.8 x 1.580 = 257.2 kg.
  • H20: 20² / 162 = 2.469 kg/m. 16 x 1.845 = 29.52 m. 29.52 x 2.469 = 72.9 kg.
  • H12: 12² / 162 = 0.889 kg/m. 32 x 1.052 = 33.66 m. 33.66 x 0.889 = 29.9 kg.
  • Total for four footings: 257.2 + 72.9 + 29.9 = 360.0 kg.

You can check each line with the rebar weight calculator. The method behind the weights is in rebar weight calculation.

How to check a BBS you receive

  1. Match every mark to the drawing. Each callout should lead to a mark, and each mark should appear on a drawing.
  2. Check the count. Recalculate bars from spacing and dimensions, including the plus-one bar.
  3. Check the multiplier. No. of members x no. in each = total. A common mistake is a footing schedule for one footing when the plan shows six.
  4. Check the cover. Straight bar length should equal the concrete dimension minus cover at both ends.
  5. Check the shape against the detail. If the detail shows a hook and the schedule says 00, one of them is wrong.
  6. Check the revision. Make sure the schedule revision matches the drawing revision.

The callout side of this check is covered in how to read rebar callouts.

Frequently asked questions

What is a bar bending schedule?

It is a table listing every reinforcing bar in an element or project, one line per bar mark. Each line gives the bar size, number of bars, cut length, shape code and bending dimensions. Fabricators cut and bend from it, and fixers use it to place the bars.

Who prepares the bar bending schedule?

It depends on the region and contract. On many UK-style projects the designer or a detailer issues schedules with the drawings. In the US the rebar detailer usually prepares placing drawings and bar lists from the engineer's structural drawings.

Why is the cut length shorter than the sum of A, B and C?

The dimensions are measured to the outside of the bar, but the bar takes a curve at each bend. The length lost at the curves is deducted in the shape code formula, using the bar diameter and bend radius.

How do I calculate the weight from a BBS?

Multiply the total number of bars by the cut length to get total metres for each mark, then multiply by the unit mass. For metric bars the unit mass is the diameter squared divided by 162 in kg/m. Add up all marks for the total.

This article explains general practice for learning purposes. On a real project, the drawings, the general notes and the governing code always win.

Keep reading

The whole library

Free download

The Rebar Callout Cheat Sheet

One printable page: the five questions every callout answers, four labels decoded, and the same bar in six notations. Keep it next to the set of plans.

Plus a few short emails on reading structural drawings. Unsubscribe any time. Privacy.