What Does SIM Mean on Structural Drawings?

3 min read · By a practising structural engineer · Updated November 2026

Typical details: pad footing starters, wall corners and mat edge
Sheet from the example drawing set in the course

SIM means similar. When a section mark or detail reference says SIM, the referenced detail applies at that location too, but not exactly: something differs, such as a dimension, the side the detail faces, or the number of bars.

Where you see SIM on a drawing

On the drawing you will see SIM mostly in section and detail callouts. A section bubble on a plan shows the detail number and the sheet it is on, for example 5/S-501. When the same detail is reused at a location that is close but not identical, the designer writes 5/S-501 SIM next to the bubble.

Typical uses:

  • A wall footing detail drawn for an 8 in wall, referenced SIM at a 10 in wall
  • A slab edge detail drawn at the north side, referenced SIM at the south side, where it is a mirror image
  • A beam-to-wall connection drawn for one beam, referenced SIM at another beam of a different depth

SIM is often paired with OPP (opposite) or OPP HAND, which tells you the detail is mirrored. How section marks and details are linked is covered in sections, details and elevations.

What SIM changes in a takeoff

SIM tells you to take the bars from the referenced detail, then adjust them to the real geometry at the new location. The bar types and arrangement stay; the lengths and sometimes the counts change.

Worked example

Detail 5/S-501 shows a wall on a strip footing: 8 in wall, 24 in wide footing, (3) #5 CONT bottom bars and #4 @ 12" transverse bars cut at 1'-6" (24 in wide, minus 3 in cover each side). The plan references 5/S-501 SIM at a wall where the footing schedule gives a 36 in wide footing.

Item Detail as drawn SIM location
Footing width 24 in 36 in
Transverse #4 bar length 24 - 6 = 18 in 36 - 6 = 30 in
Longitudinal bars (3) #5 CONT (3) #5 CONT, unless the schedule says more

If you had taken the detail as drawn, every transverse bar at the SIM location would be 12 in short. Where the footing schedule gives a different number of longitudinal bars for the wider footing, the schedule wins.

A common mistake

The most common mistake is reading SIM as "same" and copying the detail without asking what differs. The second is not checking which other sheet carries the difference: a footing schedule, a wall schedule or a dimension on the plan. A useful habit is to write next to every SIM reference what you think the difference is. If you cannot find any, or the difference is not clear enough to price, that is a good RFI.

SIM is close to TYP but not the same: TYP means the condition repeats identically, SIM means it repeats with changes. See what TYP means and the typical details article.

Frequently asked questions

What is the difference between SIM and TYP?

TYP (typical) means the detail applies the same way everywhere it occurs. SIM (similar) means it applies with differences that you must work out from the plans and schedules at that location.

What does SIM OPP mean?

Similar, opposite hand: the detail is mirrored at this location, and may also differ in other small ways. Bars that were on the left in the detail are on the right here.

Does SIM mean the rebar is the same?

The arrangement is usually the same, but lengths, and sometimes sizes or counts, can change with the geometry. Check the schedules and dimensions at the SIM location before reusing the bar list.

This article explains general practice for learning purposes. On a real project, the drawings, the general notes and the governing code always win.

Keep reading

The whole library

Free download

The Rebar Callout Cheat Sheet

One printable page: the five questions every callout answers, four labels decoded, and the same bar in six notations. Keep it next to the set of plans.

Plus a few short emails on reading structural drawings. Unsubscribe any time. Privacy.